1.

FLASHCARD QUESTION

Front

Certificated mechanic with a power plant rating may perform

Back

 100-hour inspection required by FAA regulations on powerplants, propellers, or any components therof, and may release the same to service

2.

FLASHCARD QUESTION

Front

In accordance with the table of sanction under PCAR’s part of the penalty for “ Failure to complete and sign maintenance release” is?

Back

15 to 30 day suspension

3.

FLASHCARD QUESTION

Front

Changes to the basic design of or the relocation of brackets or braces of the propeller control are considered

Back

propeller minor repair

4.

FLASHCARD QUESTION

Front

Making simple fabric pitches not required rib stitching or removal of structural parts control surfaces is considered as

Back

preventive maintenance

5.

FLASHCARD QUESTION

Front

After a mechanic holding an airframe and power plant rating completes a 100 hour inspection, what actions is required AMRPHILIPPINES

before the aircrafts returned to service?

Back

make the proper entries in the aircraft’s maintenance record

6.

FLASHCARD QUESTION

Front

Each person performing an annual or 100-hour inspection shall use a check list that contains at least those items in the appendix of

Back

14 CFR part 43 

7.

FLASHCARD QUESTION

Front

Repair operation on hydraulic/pneumatic accessories, complete disassembly of complex hydraulic/ pneumatic power valves if repairable, per manufacturer’s instruction are classified as

Back

appliance major alteration

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?