1.

FLASHCARD QUESTION

Front

As a group, the common methods of modifying structural members can be referred to as _____?

Back

structural penetrations

2.

FLASHCARD QUESTION

Front

At what location is notching not permitted in structural members?

Back

The center third

3.

FLASHCARD QUESTION

Front

The maximum permissible size for a hole bored through the center of a floor joist is _____.

Back

one-third the depth of the joist

4.

FLASHCARD QUESTION

Front

When a floor joist is cut back and reinforced to clear a fitting, the process is called _____?

Back

boxing

5.

FLASHCARD QUESTION

Front

For installations where multiple pipes are run side-by-side, an often-used support method is the _____?

Back

trapeze hanger

6.

FLASHCARD QUESTION

Front

Fiberglass pipe insulation is supplied with a laminated cover layer referred to as ASJ. What does ASJ stand for?

Back

All service jacket

7.

FLASHCARD QUESTION

Front

When soldering a fitting prior to applying flexible foam insulation using the slip-on method, push the insulation on the pipe away from the fitting and _____?

Back

apply clamps to the pipe

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?