1.

FLASHCARD QUESTION

Front

When connecting round metal duct sections, a minimum of ____ self-taping sheet metal screws should be used.

Back

3

2.

FLASHCARD QUESTION

Front

True or False: The flexible duct system is the most economical.

Back

False

3.

FLASHCARD QUESTION

Front

The applied voltage (the voltage that the unit will actually be drawing) should be within ____ % of the rated voltage of the unit.

Back

10

4.

FLASHCARD QUESTION

Front

Insulation on duct does not prevent duct from sweating.

Back

False

5.

FLASHCARD QUESTION

Front

A disconnect or shutoff switch should be installed within $25$ feet of each unit and within sight of the unit.

Back

25

6.

FLASHCARD QUESTION

Front

A package unit comes from the factory with the charge inside.

Back

True

7.

FLASHCARD QUESTION

Front

18-4 low-voltage wire is _________.

Back

18-gauge wire with 4 conductors inside

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?