Concrete and Masonry CFR 1926.700 Subpart Q

Concrete and Masonry CFR 1926.700 Subpart Q

Assessment

Flashcard

Created by

Quizizz Content

Professional Development

Professional Development

Hard

Student preview

quiz-placeholder

19 questions

Show all answers

1.

FLASHCARD

Front

Costs associated with injuries and illnesses include those associated with: Time away from work by experienced workers, Training replacements for injured workers, More compensation claims.

Back

All of the above

2.

FLASHCARD

Front

Concrete buckets should be routed

Back

So that no, or the fewest workers possible are exposed to overhead hazards

3.

FLASHCARD

Front

Manually guided powered concrete trowels must be equipped with

Back

An automatic shutoff switch

4.

FLASHCARD

Front

Drawings (or plans) must be available on the jobsite for: Jack layout, Forming and shoring, Scaffolds, All of the above

Back

All of the above

5.

FLASHCARD

Front

Reshoring should be erected

Back

As soon as forms and shores are removed

6.

FLASHCARD

Front

Lifting hardware for precast concrete must be able to support

Back

5 times the intended load placed on them

7.

FLASHCARD

Front

Do not enter a concrete storage facility unless the system has been: Shut down, Locked out, Tagged, All of the above

Back

All of the above

8.

FLASHCARD

Front

Eccentric loads on shore heads are

Back

Permitted when the members are specifically designed for such loads

9.

FLASHCARD

Front

Adjustments to single post shores used to raise framework

Back

Should not be made after the placement of the concrete

10.

FLASHCARD

Front

When should reshoring be removed?

Back

Only after the concrete has attained adequate strength.