1.

FLASHCARD QUESTION

Front

The main purpose of foundations is to:___________(2.3.5)

Back

Provide a level, stable surface to safely support a building, Transfer building loads to soil, Anchor the building from wind, flood, and seismic loads.

2.

FLASHCARD QUESTION

Front

What is the approximate frost depth in Noblesville, IN?

Back

20 in

3.

FLASHCARD QUESTION

Front

Calculate the required concrete if the required total footage is 750 ft3. How many yards will be needed for concrete?

Back

28.5 yd3

4.

FLASHCARD QUESTION

Front

Calculate the total cost of the concrete if the required total footage is 750 ft3. What will be the total cost of the concrete if concrete is $98/yd3?

Back

$2,793.00

5.

FLASHCARD QUESTION

Front

What will be a problem that will result from ordering too little concrete?

Back

An increase in the time and cost of construction.

6.

FLASHCARD QUESTION

Front

Electricity is supplied to a building via a service drop that includes: a. Three wires, b. Two wires carry 120 volts of alternating current (AC) such that the voltages are opposite, c. One wire is neutral or ground (zero volts), d. All of the above

Back

All of the above

7.

FLASHCARD QUESTION

Front

What distributes power to the building and is the main breaker that allows all power to be switched off?

Back

main panel

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?