1.

FLASHCARD QUESTION

Front

When Sheri is framing a building, sills are installed:

Back

first

2.

FLASHCARD QUESTION

Front

Because extra strength is needed for support, most framing lumber used for wood buildings should be:

Back

2" thick.

3.

FLASHCARD QUESTION

Front

When Jan uses platform-type framing, where is the top plate attached?

Back

on top of the studs

4.

FLASHCARD QUESTION

Front

When a carpenter frames a building using platform framing, the floor joist header is installed:

Back

second.

5.

FLASHCARD QUESTION

Front

Trimmer studs for doors are installed:

Back

on each side.

6.

FLASHCARD QUESTION

Front

What are the horizontal parts of a building’s framing to which the studs are attached?

Back

plates

7.

FLASHCARD QUESTION

Front

What framing part should a carpenter nail to both the top plate and the sole plate?

Back

stud

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?