1.

FLASHCARD QUESTION

Front

The primary purpose of a Ground Fault Circuit Interrupter (GFCI) is to:

Back

protect against electrical shock

2.

FLASHCARD QUESTION

Front

A load center in electrical systems is:

Back

a device that distributes electrical power to various circuits.

3.

FLASHCARD QUESTION

Front

The term for the vertical face between stair treads is:

Back

Riser

4.

FLASHCARD QUESTION

Front

What is the correct response when discovering damaged electrical equipment?

Back

Report it immediately to a supervisor.

5.

FLASHCARD QUESTION

Front

The primary purpose of subflooring in a floor system is to:

Back

provide a level surface for the finished floor

6.

FLASHCARD QUESTION

Front

What is a wythe in masonry construction?

Back

A vertical section of masonry

7.

FLASHCARD QUESTION

Front

The proper installation direction for tongue and groove subflooring is:

Back

Perpendicular to the floor joists

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?