L2 Foundation Unit 103 (1/2)

L2 Foundation Unit 103 (1/2)

Assessment

Flashcard

Construction

Vocational training

Hard

Created by

Richard James

FREE Resource

Student preview

quiz-placeholder

37 questions

Show all answers

1.

FLASHCARD QUESTION

Front

What are two key purposes of surveying before construction begins?

Back

To determine the distances between set points and to record the levels and features of the existing ground.

2.

FLASHCARD QUESTION

Front

During construction what four key aspects does a surveyor set out and ensure are correct?

Back

Roads, drains, foundation heights, and the positions of buildings or structures.

3.

FLASHCARD QUESTION

Front

Surveying ensures that drains are constructed to fall at the correct _____.

Back

angle

4.

FLASHCARD QUESTION

Front

What is the name of the simple traditional surveying method used for small, fairly level, and open areas?

Back

Chain surveying.

5.

FLASHCARD QUESTION

Front

Chain surveying uses a network of _____ to plot positions.

Back

triangles

6.

FLASHCARD QUESTION

Front

What surveying method is used when an area is too large for chain surveying?

Back

Compass surveying.

7.

FLASHCARD QUESTION

Front

Compass surveying cannot be used in areas containing what two features that can affect readings?

Back

Iron ore or power lines.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?