Level 3 YR2 Unit 315 Session 9 commissioning and handover
Presentation
•
Other
•
Professional Development
•
Practice Problem
•
Easy
Plumbers Cymoedd
Used 12+ times
FREE Resource
6 Slides • 11 Questions
1
Building Regulations Compliance certificates
From 1 April 2005 the Building Regulations demanded that all installations must be issued with a Building Regulations Compliance certificate. This is to ensure that all Building Regulations relevant to the installation have been followed and complied with
2
Commissioning records
Commissioning records for large cold water systems should be kept for reference during maintenance and repair and to ensure that the system meets the design specification.
Typical information that should be included on the record is as follows:
● the date, time and the name(s) of the
commissioning engineer(s)
● the location of the installation
● the amount of cold water storage (if any)
● the types and manufacturer of equipment and
components installed
● the type of pressure test carried out and its duration
● disinfection processes, the disinfection chemicals
used and the disinfection readings
● the flow rates and pressures at the outlets
● the pressures on both the suction side and the
discharge side of any boosting pumps
● the accumulator pressure.
3
Follow the link below and answer the questions on the next slides.
https://aphc.co.uk/news/commissioning-why-its-an-important-part-of-plumbing-heating-work/
4
Multiple Choice
What is commissioning in the context of systems or major components?
Dismantling a system
Putting it into safe and effective operation
Designing a system
Decommissioning a system
5
Multiple Choice
Why is it mentioned that time pressures at the end of a job can impact commissioning?
To emphasize the need for quick installations
To highlight the importance of proper commissioning
To discourage commissioning in general
To suggest delaying commissioning
6
Multiple Choice
In large contract work, what is usual to see for the commissioning process?
Full commissioning details for each component
A commissioning plan outlining the process
No commissioning plan
Minimal documentation
7
Multiple Choice
What are the three phases of the commissioning process for most systems?
Testing, inspection, and certification
Installation, verification, and validation
Visual inspection, soundness test, and performance test
Cleaning, testing, and sealing
8
Multiple Choice
What is the purpose of the soundness test in the commissioning process?
To check for visual compliance
To test the performance of the system
To ensure the system is leak-free
To assess the efficiency of the components
9
Multiple Choice
Why is it important to retain a copy of the commissioning record?
For customer reference only
To demonstrate compliance with regulations
As a backup in case of leaks
To save paper
10
When the system has been tested and commissioned, it can then be handed over to the customer. The customer will require all documentation regarding the installation and this should be presented to the customer in a file, which should contain:
● all manufacturers’ installation, operation and
servicing manuals for the taps, sanitary ware and any other equipment fitted to the installation such as boosting pumps and accumulators
● the commissioning records and certificates
● the water undertaker’s acceptance of the system
● the Building Regulations Compliance certificate
● an ‘as fitted’ drawing showing the position of all isolation valves, backflow prevention devices, etc
11
12
The customer must be shown around the system
and shown the operating principles of any controls.
Emergency isolation points on the system should
be pointed out and a demonstration of the correct isolation procedure in the event of an emergency.
13
Multiple Choice
What documents should be included in the file presented to the customer upon system handover?
Only commissioning records and certificates
Manufacturers' operation manuals only
All manufacturers' installation, operation, and servicing manuals, commissioning records, and more
Only the water undertaker's acceptance of the system
14
Multiple Choice
Why is it important to include an 'as fitted' drawing in the documentation provided to the customer?
It is a legal requirement
It is a decorative addition
It shows the customer the design phase
It indicates the position of important components
15
Multiple Choice
What should be demonstrated to the customer during the system handover?
Installation procedures
Emergency isolation points only
Operating principles of controls and emergency isolation procedure
Manufacturer's guidelines
16
Multiple Choice
What is the purpose of the water undertaker's acceptance of the system in the documentation?
To prove compliance with building regulations
To demonstrate correct isolation procedures
To show the customer the system's design
To confirm acceptance by the local water authority
17
Multiple Choice
Why is the Building Regulations Compliance certificate included in the documentation for the customer?
It serves as a decorative element
It is a legal requirement
It is optional for the customer's reference
It provides information on emergency procedures
Building Regulations Compliance certificates
From 1 April 2005 the Building Regulations demanded that all installations must be issued with a Building Regulations Compliance certificate. This is to ensure that all Building Regulations relevant to the installation have been followed and complied with
Show answer
Auto Play
Slide 1 / 17
SLIDE
Similar Resources on Wayground
12 questions
Equity Lab - Data Review
Presentation
•
Professional Development
10 questions
PRESENT CONTINUOUS
Presentation
•
Professional Development
14 questions
Electron Math
Presentation
•
9th - 12th Grade
13 questions
Hematology
Presentation
•
KG
14 questions
STArt Sentences
Presentation
•
KG - Professional Dev...
11 questions
10 interesting facts about animals
Presentation
•
KG - Professional Dev...
13 questions
SEL & Wellness Check-In
Presentation
•
KG - Professional Dev...
13 questions
ACCOUNTING
Presentation
•
University
Popular Resources on Wayground
21 questions
Continents and Oceans
Quiz
•
6th Grade
20 questions
Parts of Speech
Quiz
•
5th Grade
16 questions
Subject & Predicate
Quiz
•
5th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
12 questions
Map Skills
Quiz
•
3rd Grade
22 questions
Continents and Oceans
Quiz
•
5th Grade
15 questions
Rounding Decimals
Quiz
•
5th Grade
20 questions
Brand Labels
Quiz
•
5th - 12th Grade
Discover more resources for Other
10 questions
How to Email your Teacher
Quiz
•
Professional Development
40 questions
Flags of the World
Quiz
•
KG - Professional Dev...
4 questions
Exit ticket for the end of class: Spotlight
Quiz
•
KG - Professional Dev...
20 questions
90s Cartoons
Quiz
•
Professional Development
20 questions
Block Buster Movies
Quiz
•
10th Grade - Professi...
10 questions
How to Email your Teacher
Quiz
•
Professional Development