Testing and commissioning of hot water systems
Documents required to carry out commissioning tasks
Testing and commissioning of hot water systems is probably the most important part of any installation, as it is here that the system design is finally put into operation. For an installation to be successful the following documents must be complied with:
manufacturers’ instructions
job specification
Water Regulations
Building Regulations: Parts G, L and P
Correct commissioning procedures and system set-up often make the difference between a system working to the specification and failing to meet the required demands.
2
Click on the link below and use the document along with the internet to answer the questions on the following pages:
3
Multiple Choice
What is the test pressure for plastic pipework?
1 ½ times the working pressure
2 times working pressure
1 times working pressure
3 times working pressure
4
Multiple Choice
What action should be carried out in the first stage of flushing an unvented domestic hot water system?
Fill storage cistern first
Open the cold water supply and fill the storage vessel with water.
Only fill pipework
Fill system with air
5
Multiple Choice
What documents must be used for successful installation commissioning?
Operation manuals only
Building Regulations only
Water Regulations only
Manufacturers’ instructions, job specification, Water Regulations, Building Regulations
6
Multiple Choice
Before soundness testing, what should be checked according to the manufacturers’ instructions?
Ambient temperature
Expansion vessel charge pressure
Building height
7
Multiple Choice
What is the usual source for the initial system fill of fluid category 1 water?
Rainwater harvesting
Local river water
Water undertaker’s main cold water supply
Bottled water
8
Multiple Choice
How is the system filled during the initial fill process?
Rapidly to save time
In one stage
Slowly in stages
9
Multiple Choice
Which British Standard describes the procedure for soundness testing hot water systems?
BS6700
BS7671
BS5839
BS5930
10
Multiple Choice
What is the requirement for flushing hot water systems according to British Standards?
Optional
Not necessary
Mandatory
Every 5 years
11
Multiple Choice
Why should hot water storage vessels and cold water storage cisterns be drained down completely during flushing?
To save water
To reduce system pressure
To remove potential contaminants
To clean the pipes
12
Multiple Choice
How often should unvented hot water storage systems be serviced?
Every 6 months
Every 12 months
Every 2 years
Every 5 years
13
Multiple Choice
What should be checked during the periodic servicing of unvented hot water systems?
Water pressure in the neighbourhood
Air quality
Components, pressure in the expansion vessel, and cleaning the in-line strainer
Outdoor temperature
14
Multiple Choice
Which document is most important for diagnostic checks on hot water systems?
Local building codes
Manufacturer’s instructions
British Standards only
Water Regulations
15
Multiple Choice
What do manufacturer’s instructions usually contain for fault-finding?
Flow charts, symptoms, and replacement techniques
No information on fault finding
Telephone numbers of local engineers
Spare part prices
16
Multiple Choice
In areas with hard water conditions, how often are inspections recommended for unvented hot water systems?
Every 3 months
Every 6 months
Once a year
Every 2 years
17
Multiple Choice
Which document takes precedence over British Standards and Regulations?
Manufacturer’s instructions
Local newspapers
Commissioning records
Sketches made during installation
18
Multiple Choice
What is the reason for more frequent inspections in hard water areas?
Increased risk of limescale buildup
High humidity
Excessive rainfall
Unstable atmospheric pressure
19
Multiple Choice
Why is it important to keep commissioning records for hot water systems?
Decoration purposes
To comply with local traditions
To use as bookmarks
For reference during maintenance and repair
20
Multiple Choice
When servicing an unvented hot water system it is found the thermal pressure valve is not releasing any water. What action should be taken?
Don’t do anything, as it is not under any pressure.
The blockage is only sediment and will clear when it overheats.
Replace the valve making sure you fit the same bar type as the existing
Shut down the system and inform the manufacturer immediately.
21
Multiple Choice
The expansion-relief valve is dripping water when the system is cold and runs water when the system is on. Which one of the following is the most likely cause?
The system is overheating.
The expansion-relief valve is not seated properly.
The pressure-regulating valve has stopped working.
The strainer is blocked.
22
Multiple Choice
The expansion-relief valve runs when the system is hot but is okay when the system is cold. Which one of the following is the most likely cause?
The expansion vessel needs recharging.
The thermostat is set too high.
The boiler thermostat is set too high.
The expansion relief valve is faulty.
23
Multiple Choice
The expansion valve in an unvented hot water storage system is not working to specification when installed in a hard water area. Which one of the following is the most likely cause?
Build-up of calcium carbonate deposits.
Build-up of silt from within the system.
Faulty electrical supply to the valve.
Inlet pressure is too high for the system.
24
Multiple Choice
In indirect unvented system water from the mixer taps is running cold. One possible cause is:
high-pressure hot water surge from the cylinder.
expansion-relief valve is letting by.
hot and cold pressures at shower/mixer taps are unbalanced.
indirect thermal control cut-out has operated.
25
Multiple Choice
In the unvented hot water system, shown below, a full flow of water and steam discharges from the temperature relief valve intermittently. Which two of the following components are likely to be faulty?
A and B
A and C
D and E
F and H
26
Multiple Choice
The unvented cylinder has overheated the thermal expansion valve is blowing steam into the tundish. What action should be taken?
Turn off the water main.
Ring 999.
Drain down the system.
Turn off the source of heat.
27
Multiple Choice
Which one of the following should be carried out before removing a motorised valve from an unvented cylinder?
Ensure the electricity supply has been safely isolated.
Open the expansion- and temperature-relief valves.
Drain the hot water supply through the tundish.
Ensure the expansion vessel is fully compressed.
28
Multiple Choice
Which one of the following is the first activity that should be carried out when maintaining an unvented system?
Check for evidence of discharge from the relief valves.
Remove and clean the line strainer.
Notify the Water Supplier that maintenance is taking place.
Notify WRAS that maintenance work is taking place.
29
Multiple Choice
In high-pressure systems containing mixer taps, the pressure reducing valve should be positioned so that:
the hot water pressure is higher at the mixer taps.
the cold water pressure is higher at the mixer taps.
both hot and cold water outlets are operating at the same pressure.
the pressure at the mixer taps exceeds the supply inlet pressure.
Testing and commissioning of hot water systems
Documents required to carry out commissioning tasks
Testing and commissioning of hot water systems is probably the most important part of any installation, as it is here that the system design is finally put into operation. For an installation to be successful the following documents must be complied with:
manufacturers’ instructions
job specification
Water Regulations
Building Regulations: Parts G, L and P
Correct commissioning procedures and system set-up often make the difference between a system working to the specification and failing to meet the required demands.
Show answer
Auto Play
Slide 1 / 29
SLIDE
Similar Resources on Wayground
21 questions
Oro A1 Entrance Test
Presentation
•
KG
24 questions
properties of addition
Presentation
•
1st Grade
23 questions
L1 Slides – Digital photography – Y2
Presentation
•
1st Grade
21 questions
Go Math Chapter 10
Presentation
•
1st Grade
21 questions
Interpret Data
Presentation
•
1st Grade
22 questions
Similar Figures, find scale factor and solve for missing sides
Presentation
•
KG
22 questions
SS 4.9 Lesson
Presentation
•
5th Grade
25 questions
Physical and Chemical Changes Review
Presentation
•
8th Grade
Popular Resources on Wayground
20 questions
STAAR Review Quiz #3
Quiz
•
8th Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
6 questions
Marshmallow Farm Quiz
Quiz
•
2nd - 5th Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
20 questions
Inferences
Quiz
•
4th Grade
19 questions
Classifying Quadrilaterals
Quiz
•
3rd Grade
12 questions
What makes Nebraska's government unique?
Quiz
•
4th - 5th Grade
Discover more resources for Mathematics
20 questions
Telling Time to the Hour and Half hour
Quiz
•
1st Grade
16 questions
Counting Coins counting money
Quiz
•
1st - 2nd Grade
20 questions
Halves and Fourths
Quiz
•
1st Grade
10 questions
CA4 Math Review
Presentation
•
1st - 5th Grade
20 questions
Addition and Subtraction facts
Quiz
•
1st - 3rd Grade
16 questions
3D shapes (1st grade)
Quiz
•
1st Grade
20 questions
place value
Quiz
•
1st Grade
19 questions
time to the hour and half hour
Quiz
•
1st Grade