Unit 331 / 15 Commission cold water systems and components
Presentation
•
Construction
•
Vocational training
•
Practice Problem
•
Hard
Jay King
FREE Resource
26 Slides • 20 Questions
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Multiple Choice
Which of the following is a potential consequence of inadequate commissioning and maintenance of cold water systems?
Blue-water corrosion
Increased water pressure
Reduced pipe diameter
Lower water temperature
28
Multiple Select
Which documents must be consulted to ensure correct commissioning procedures for cold water systems?
Water Supply (Water Fittings) Regulations 1999
British Standard BS 6700 and BS EN 806
Building Regulations Approved Document G1 and G2
Manufacturer’s instructions of equipment and appliances
29
Multiple Choice
During a visual inspection of a boosted cold water system, which of the following should be checked to ensure installation meets industry standards?
That all open ends are capped off and all valves are isolated
That the water temperature is above 60°C
That the system is painted blue
That the system is connected to the gas supply
30
Fill in the Blanks
A pressure booster pump installation that draws more than
Type answer...
31
Multiple Choice
In the diagram of a pressure booster pump system, what is the purpose of the protected break cistern?
To separate the booster pump from the incoming supply pipe
To increase the water temperature
To filter the water
To reduce noise in the system
32
Multiple Choice
What is the main reason for filling a plumbing system in stages during the initial fill?
To check for leaks at each stage
To save water
To speed up the process
To reduce water pressure
33
Multiple Select
Which of the following are recommended practices to avoid airlocks during the filling of cistern-fed supplies?
Filling each stage slowly and methodically
Allowing cisterns to fill to capacity before opening gate valves
Trickle filling the system
Opening all valves at once
34
Fill in the Blanks
Before soundness testing a cold water system, a thorough visual inspection should include checking that all open ends are
Type answer...
35
Multiple Choice
What is the main safety precaution that should be taken before conducting a pressure (soundness) test on a plumbing system?
Carry out a risk assessment and use PPE
Open all valves
Increase water pressure rapidly
Bypass the safety valves
36
Multiple Choice
Which of the following should be checked before starting a soundness test on a plumbing system?
Availability of operatives
Type of pipe material
Water temperature
Presence of insulation
37
Multiple Choice
According to the UK Water Regulations, what is the minimum internal water pressure a system should withstand during a soundness test?
Equal to the maximum operating pressure
1.5 times the maximum operating pressure
Twice the maximum operating pressure
1.5 times the maximum pressure to which the installation is subjected in operation
38
Multiple Choice
After testing a system containing no plastic, what important step should be taken?
Flush the system
Keep a careful record of the test carried out
Replace all valves
Increase the water pressure
39
Fill in the Blanks
Regulation 12 states that the test for non-elastomeric pipes should continue for one hour without further
Type answer...
40
Multiple Select
Which of the following are steps involved in Test type A for soundness testing?
Raise pressure to 1 bar and check for leaks
Increase pressure to 1.5 times normal operating pressure
Release pressure to 1/3 of previous pressure
Maintain pressure for 2 hours
41
Multiple Choice
Which of the following is NOT a circumstance that requires the disinfection of water piping systems according to the British Standard?
In new installations (except private dwellings occupied by a single family)
Where large extensions or alterations to systems have been undertaken
Where the system has been regularly flushed and maintained
Where underground pipework has been installed
42
Multiple Choice
Which of the following issues can result from poor installation techniques in plumbing systems?
Noise
Undue warming of cold water systems
Leakage
All of the above
43
Fill in the Blanks
Commissioning records for large cold water systems should include the
Type answer...
44
Multiple Select
Select all the types of information that should be included in a commissioning record for large cold water systems.
The type of pressure test carried out and its duration
The disinfection chemicals used and the disinfection readings
The color of the pipes used
The accumulator pressure
45
Multiple Choice
Which of the following is NOT one of the objectives of this session on cold water system planning and design?
Carry out visual inspections
Install heating systems
Conduct soundness tests
Complete commissioning records
46
Multiple Choice
Why is it important to commission cold water systems and components in plumbing installations?
To ensure the system operates efficiently and safely
To increase the cost of installation
To reduce the lifespan of the system
To avoid using any safety checks
Show answer
Auto Play
Slide 1 / 46
SLIDE
Similar Resources on Wayground
39 questions
8B Unit 8 A green world wecome to the unit
Presentation
•
8th Grade
42 questions
Copy of G2_K10_L5_22-23
Presentation
•
KG - Professional Dev...
41 questions
CW01_sources and properties of water
Presentation
•
KG - University
39 questions
Volleyball Unit Intro
Presentation
•
Professional Development
40 questions
Combining Like Terms
Presentation
•
6th - 8th Grade
39 questions
Levels of Engagement
Presentation
•
KG
41 questions
SLAC
Presentation
•
KG
40 questions
EF Intermediate Unit 3
Presentation
•
KG
Popular Resources on Wayground
21 questions
Continents and Oceans
Quiz
•
6th Grade
20 questions
Parts of Speech
Quiz
•
5th Grade
16 questions
Subject & Predicate
Quiz
•
5th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
12 questions
Map Skills
Quiz
•
3rd Grade
22 questions
Continents and Oceans
Quiz
•
5th Grade
15 questions
Rounding Decimals
Quiz
•
5th Grade
20 questions
Brand Labels
Quiz
•
5th - 12th Grade