Search Header Logo
Crane and Hoist unit 8

Crane and Hoist unit 8

Assessment

Presentation

Education

University

Practice Problem

Medium

Created by

norfaezah hanapiah

Used 1+ times

FREE Resource

12 Slides • 12 Questions

1

media

2

media

3

Multiple Choice

What are the fundamental operations of cranes and hoists?

1

Lifting heavy loads

2

Moving horizontally

3

Rotating in place

4

All of the above

4

media

5

Multiple Choice

The part of the overhead crane that moves laterally, not lengthwise.

1

Cab

2

Trolley

3

Winch

4

Gantry

5

Caboose

6

Multiple Choice

What is a crane used for?

1

Lifting heavy materials

2

Transporting people

3

Digging holes

4

Mixing concrete

7

media

8

Multiple Choice

What are the advantages of using a chain hoist?

1

Used for heavy-duty work

2

Portable and compact design

3

Can only lift up to 2 tons

4

Faster than wire rope hoist

9

media

10

Multiple Choice

What is the maximum capacity of the wire rope hoist?

1

10 tons

2

15 tons

3

20 tons

4

25 tons

11

media

12

Multiple Choice

What are the different types of cranes mentioned in the image?

1

Single Girder Crane

2

Double Girder Crane

3

Gantry Crane

4

Monorail

13

media

14

Multiple Choice

What are the different types of hoists and their weight capacities?

1

Ratchet Lever: 0.75-6 tons

2

Hand Chain: 0.5-25 tons

3

Electric Chain: 0.5-3 tons

4

Electric Wire Rope: 0.125-5 tons

15

media

16

Multiple Choice

What is the function of the Trolley in crane and hoisting components?

1

Moves hoist across bridge

2

Supports crane movement

3

Absorbs impact at travel limits

4

Lifts and lowers load

17

media

18

Multiple Choice

What are the main components of a crane and hoisting system?

1

Hoist

2

Pendent Cable

3

Trolley Drive

4

End Truck

19

media

20

Multiple Choice

What are the requirements for lifting machines according to the Factories and Machinery (Electric Passenger and Goods Lift) Regulations, 1970?

1

Manufacturer certificate & load test

2

Design approval from DOSH

3

Regular inspections every 6 months

4

Owner must record and display inspection certificate

21

media

22

Multiple Choice

What are the key steps to ensure proper maintenance and troubleshooting of equipment?

1

Follow manufacturer's instructions for all tests and inspections.

2

Perform monthly in-house inspection and load testing.

3

Preventive maintenance ensures safety and longer equipment life.

4

Ignore regular maintenance schedules.

23

media

24

Poll

How confident do you feel about this topic now?

Very confident
Somewhat confident
Not confident
media

Show answer

Auto Play

Slide 1 / 24

SLIDE