H-BIM

H-BIM

Assessment

Presentation

History

University

Practice Problem

Hard

Created by

Andrea Hrubovčáková

Used 4+ times

FREE Resource

1 Slide • 12 Questions

1

​H-BIM: Use of BIM in Historical Building

By Andrea Hrubovčáková

2

Word Cloud

In ONE word, what is the biggest challenge when renovating historical buildings?

3

Multiple Choice

What does H-BIM mean?

1

High-Tech Building Information Modeling

2

Historic/Herritage Building Information Modeling

3

Hybrid Building Information Model

4

Herritage-Based Industrial Modeling

4

Multiple Select

Why is BIM especially useful for historical buildings?

(Select all that apply)

1

Historical buildings often have irregular shapes

2

Project documentation is often missing or incomplete

3

They are always built using modern standards

4

BIM helps improve accuracy in planning and costs

5

Historical buildings never change over time

5

Match

What do BIM dimensions mean?

3D

4D

5D

6D

Geometric model

Time planning

Cost management

Sustainability

6

Multiple Choice

What is the first thing created after scanning an object?

1

Final IFC model

2

Construction time schedule

3

Point cloud

4

Cost calculation

7

Multiple Choice

Why is the current state of a historical building NOT fully modeled in H-BIM?

1

Point cloud already represents the current state

2

Modeling the whole building is forbidden

3

PC cannot handle historical building model

4

Only costs are important in H-BIM

8

Multiple Select

What does the missing documentation and 3D model affect?

(Select all that apply)

1

Inaccurate cost estimation

2

Incorrect time scheduling

3

Unclear maintenance planning

4

Higher architectural creativity

5

Facade color

9

Reorder

Put the steps of historical building digitization in the correct order.

Laser scanning / drone photogrammetry

Point cloud processing and loading

Creating a geometrically accurate 3D model

Comparing the 3D model with the point cloud

1
2
3
4

10

Multiple Select

What information is obtained after linking the IFC model with the time schedule?

(Select all that apply)

1

Legal ownership of the building

2

Overall construction duration

3

Progress of individual construction processes

4

Environmental impact of renovation

11

Multiple Choice

What does 5D allow to monitor during renovation?

1

Final building maintenance requirements

2

Legal status of project approval

3

Real-time structural analysis of the building

4

Classification of cultural heritage value

5

Total costs accrued to a selected date

12

Multiple Choice

What is the BIM dimension for digitizing historic buildings called?

1

2D

2

2,5D

3

3D

4

3,5D

5

4D

13

Multiple Choice

BONUS: What was the name of the church used as a case study to demonstrate the H-BIM method?

1

St. Peter’s Church

2

St. Nicholas’ Church

3

St. Michael’s Cathedral

4

St. George’s Church

​H-BIM: Use of BIM in Historical Building

By Andrea Hrubovčáková

Show answer

Auto Play

Slide 1 / 13

SLIDE