1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of project cost estimate is the most accurate?

Preliminary
Order of magnitude
Conceptual
Definitive

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To assist in budget control, it is suggested that an estimate be created at the ______ level of the WBS.

Highest
Major work effort
Lowest
Third

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Project Cost Management Process comprises the following activities:
a. Determine Budget
b. Plan Cost Management
c. Estimate Costs
d. Control Costs
What is the correct sequence?

a-b-c-d
c-a-b-d
b-c-a-d
a-c-b-d

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The tools and techniques used in the process of Determine Budget includes all but

Cost of Quality
Cost Aggregation
Expert Judgement
Historical Relationships

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Cost Performance Baseline is a time-phased budget and is used as a basis to measure, monitor, and control overall cost performance of the project. It is usually displayed in the form of:

Pie-chart
An S-curve
A Z curve
An inverted S-curve

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Funding requirements for a project are usually in incremental amounts that are not continuous, and these appear as a step function in the graph depicting Cash flow, Cost baseline and Funding. Any gap at the end of the project, between the funds allocated and the cost baseline represents:

Charting error
Management reserves
Contingency reserves
Cost variance

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An estimating technique that uses a statistical relationship between historical data and other variables (for example, square footage in construction, lines of code in software development) is known as:

Analogous estimating
Bottom-up estimating
Historical analysis
Parametric estimating

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?