1.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
The probability that the “Super-lab” software system will be found in a state of failure during peak hours (9 am to 4 pm) is required to be below 0.5%.
Efficiency
Reliability
Correctness
Usability
2.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
The “Super-lab” software system will enable direct transfer of laboratory results to those files of hospitalized patients managed by the “MD-File” software package.
Flexibility
Testability
Interoperability
Portability
3.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
The “Super-lab” software system will include a module that prepares a detailed report of the patient’s laboratory test results during his or her current hospitalization. (This report will serve as an appendix to the family physician’s file.) The time required to obtain this printed report will be less than 60 seconds; the level of accuracy and completeness will be at least 99%.
Correctness
Testability
Maintainability
Reliability
4.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
The “Super-lab” software to be developed for hospital laboratory use may be adapted later for private laboratory use.
Correctness
Integrity
Interoperability
Flexibility
5.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
The training of a laboratory technician, requiring no more than three days, will enable the technician to reach level C of “Super-lab” software usage. This means that he or she will be able to manage reception of 20 patients per hour.
Reliability
Usability
Correctness
Reusability
6.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
The “Super-lab” software system will record a detailed users’ log. In addition, the system will report attempts by unauthorized persons to obtain medical information from the laboratory test results database. The report will include the following information: network identification of the applying terminal, system code of the employee who requested that information, day and time of attempt, and type of attempt.
Integrity & Testability
Testability & Reliability
Integrity & Interoperability
Testability & Correctness
7.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
The “Super-lab” subsystem that deals with billing patients for their tests may eventually be used as a subsystem in the “Physiotherapy Center” software package.
Flexibility
Interoperability
Usability
Reusability
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?