Search Header Logo

General Carpentry: M7 Ceiling and Roof Framing

Authored by Michael Bennett

Specialty

9th - 12th Grade

Used 80+ times

General Carpentry: M7 Ceiling and Roof Framing
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

55 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Name the building component that keeps opposing walls from spreading apart.

ceiling joists
double top plate
common studs
rafters

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In order to transfer roof loads to the foundation, where should you position the ceiling joists?

directly over the wall studs
between stud layouts
on metal anchor plates
on the top plates

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum overlap required over a loadbearing partition for ceiling joists?

3"
4"
2"
5"

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On what style house would you typically find a shed dormer?

Cape cod
Victorian
Craftsman
Federal

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Name the board nailed to the tails of the rafters to provide a nailing surface for the fascia.

false fascia
barge board
purlin
lookout

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Name the type of cut made to the rafter so the rafter will sit square on the double top plate.

bird's mouth
notch
sill cut 
joist cut

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When laying out rafters, the distance between the last two may be less than 24" but no more than ____.

24"
16"
18"
12"

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Specialty