General Carpentry: M7 Ceiling and Roof Framing

General Carpentry: M7 Ceiling and Roof Framing

9th - 12th Grade

55 Qs

quiz-placeholder

Similar activities

4th Quarter Recitation- REVIEW

4th Quarter Recitation- REVIEW

10th Grade

60 Qs

Unit 2 Microeconomics EOC Review

Unit 2 Microeconomics EOC Review

9th - 12th Grade

60 Qs

General Carpentry: M7 Ceiling and Roof Framing

General Carpentry: M7 Ceiling and Roof Framing

Assessment

Quiz

Specialty

9th - 12th Grade

Medium

Created by

Michael Bennett

Used 80+ times

FREE Resource

55 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Name the building component that keeps opposing walls from spreading apart.
ceiling joists
double top plate
common studs
rafters

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In order to transfer roof loads to the foundation, where should you position the ceiling joists?
directly over the wall studs
between stud layouts
on metal anchor plates
on the top plates

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum overlap required over a loadbearing partition for ceiling joists?
3"
4"
2"
5"

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On what style house would you typically find a shed dormer?
Cape cod
Victorian
Craftsman
Federal

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Name the board nailed to the tails of the rafters to provide a nailing surface for the fascia.
false fascia
barge board
purlin
lookout

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Name the type of cut made to the rafter so the rafter will sit square on the double top plate.
bird's mouth
notch
sill cut 
joist cut

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When laying out rafters, the distance between the last two may be less than 24" but no more than ____.
24"
16"
18"
12"

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?