Hot Water 3

Hot Water 3

University

15 Qs

quiz-placeholder

Similar activities

Hot Water 1

Hot Water 1

University

15 Qs

Hot Water 4

Hot Water 4

University

15 Qs

Domestic hot water systems

Domestic hot water systems

12th Grade - Professional Development

15 Qs

pneumatic system

pneumatic system

2nd Grade - Professional Development

14 Qs

Engine Mechanical Assessment 1

Engine Mechanical Assessment 1

9th Grade - University

20 Qs

HYDRAULICS AND PNEUMATICS

HYDRAULICS AND PNEUMATICS

University

10 Qs

Chapter 50 General Brakes Test Review

Chapter 50 General Brakes Test Review

University

15 Qs

Engine Mechanical Testing

Engine Mechanical Testing

KG - University

15 Qs

Hot Water 3

Hot Water 3

Assessment

Quiz

Other

University

Medium

Created by

Steve Endicott

Used 323+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following pieces of information will be provided by the installation plan?
The dwelling position on the estate
The expected completion date
The order in which work should take place
The position of the hot water pipes and valves in a dwelling

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The water supply (water fittings) regulations 1999 lay down
The guidance for good practice when installing hot and cold pipework in adwelling
The regulations covering all internal and external hot and cold watersystems for dwellings
The regulations that cover hot water systems only
The guidance for internal hot and cold water systems only within a dwelling.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following hot water components should be fixed using flexible connections?
Booster pump for a shower
Indirect hot water cylinder
Shower mixer valve
External bib tap

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A rigid pipework hot water system has a working pressure of 4bar. At what pressure should the pipework be tested for soundness?
1bar for 60 minutes
1½ times the working pressure for 15 minutes
4bar for 30mins then 6bar for 15 minutes
6 bar for one hour

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image
To prevent electrolytic corrosion taking place in a system, where can the magnesium rod be placed?
The cold water storage cistern
The hot water cylinder
The circulator
The open vent 

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Guidance on the installation procedures for domestic hot water systems can be found in:
Domestic Water Act 2007
Specification of work
BS6700
Local Authority Regulations

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a customer’s property, the CWSC supplies both the hot and cold water systems. The minimum size of this cistern is:
Equal to 48 hours’ worth of water
230 litres
100 litres
Twice the size of the domestic hot water cylinder 

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Other