Architecture and Construction final

Architecture and Construction final

9th - 12th Grade

41 Qs

quiz-placeholder

Similar activities

BIM I Vocab Quiz 2

BIM I Vocab Quiz 2

6th - 12th Grade

46 Qs

Acc: Basics 2

Acc: Basics 2

9th - 12th Grade

46 Qs

OnShape 2.1-2.4

OnShape 2.1-2.4

12th Grade

36 Qs

Inventor Practice

Inventor Practice

9th - 12th Grade

38 Qs

Ujian Sekolah TIK SMPK Nasiona Anglo

Ujian Sekolah TIK SMPK Nasiona Anglo

9th Grade

40 Qs

SOAL PENDALAMAN EXCEL

SOAL PENDALAMAN EXCEL

10th Grade

43 Qs

Engineering Drawings

Engineering Drawings

9th - 10th Grade

42 Qs

Electrical - Module 10 - Electrical Construction Docs

Electrical - Module 10 - Electrical Construction Docs

12th Grade

41 Qs

Architecture and Construction final

Architecture and Construction final

Assessment

Quiz

Other

9th - 12th Grade

Medium

CCSS
RI.11-12.3, RI.11-12.5, RI.8.3

+2

Standards-aligned

Created by

Alvaro Construction tech

Used 25+ times

FREE Resource

41 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

What is a subcontractor?
a business or person that carries out work for a company as part of a larger project.
a company controlled by a holding company.
a person or thing acting or serving in place of another.
in construction management are shop drawings, material data, samples, and product data.

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Media Image
What is the name of this building?
the louvre museum
the kimbell art museum
MOMA
the witte

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a general contractor?
a written or spoken agreement, especially one concerning employment, sales, or tenancy, that is intended to be enforceable by law.
is a manager, and possibly a tradesman, employed by the client on the advice of the architect, engineer or the architectural technologist or the client him/herself if acting as the manager.
a business or person that carries out work for a company as part of a larger project.
a person or business that sells goods to the public in relatively small quantities for use or consumption rather than for resale.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image
In sketchup.  what is this command?
move
rotate
push/pull
box

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image
What type of architectural drawing is this?
exterior elevation
building section
floor plan
reflected ceiling plan

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image
What type of architectural drawing is this?
building section
floor plan
exterior elevations
interior elevations

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A written communication issued by an owner authorizing a contractor to proceed with the work and establishing the date of commencement of the work.
Contract
Bidding
Notice to proceed
Award

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?