Setting Out for Basic Masonry Structures

Setting Out for Basic Masonry Structures

1st Grade

20 Qs

quiz-placeholder

Similar activities

Reconociendo antónimos y sinónimos

Reconociendo antónimos y sinónimos

1st - 2nd Grade

20 Qs

Cultura General

Cultura General

KG - University

16 Qs

第1-4课 (Bab 1-4)

第1-4课 (Bab 1-4)

1st - 3rd Grade

20 Qs

My Body Parts

My Body Parts

1st - 3rd Grade

15 Qs

TORRE EIFFEL

TORRE EIFFEL

KG - 1st Grade

16 Qs

RBT T1 : BAB 2 PENGURUSAN PROJEK

RBT T1 : BAB 2 PENGURUSAN PROJEK

1st - 3rd Grade

20 Qs

CONVeYancing

CONVeYancing

1st Grade

15 Qs

Quizizz Repaso Manual II y III CAMEL y WINSTON

Quizizz Repaso Manual II y III CAMEL y WINSTON

1st - 10th Grade

16 Qs

Setting Out for Basic Masonry Structures

Setting Out for Basic Masonry Structures

Assessment

Quiz

Other

1st Grade

Practice Problem

Medium

Created by

Paul Heald

Used 209+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A datum peg is used on site to;

Mark out walls
Set out roads
Set out roof trusses
Take all levels from

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

2 pegs are too far apart by 300mm to be checked for level using a spirit level. What would you use with the spirit level to span the pegs?

Spandrel
Builders line
Straight Edge
Sky Hooks

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What type of hammer would you use for knocking in the wooden pegs when marking out a site?

Lump hammer
Claw Hammer
Pin hammer
Sledge hammer

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

If broken bond is to be used it should be placed:

At the corner
Below an opening
Anywhere in the wall
Where the layer of bricks meet

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A convenient height for a site datum is;

Foundation height
Lintel height
Roof height
Finished floor level

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When transferring levels from a datum point to a building, the following equipment should be used;

Profile board & traveller
Site square
Line & pins
Straight edge & level

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A level used on site that works shooting a red dot onto a staff is a;

Dumpy level
Water level
Laser level
Theodolite

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?