L3 Core 07 Analysing technical information, quantities and c

L3 Core 07 Analysing technical information, quantities and c

KG - University

40 Qs

quiz-placeholder

Similar activities

TLE 8 - ICT technical Drafting_1st Summative Test

TLE 8 - ICT technical Drafting_1st Summative Test

8th Grade

35 Qs

CMT 210 Midterm Study Guide

CMT 210 Midterm Study Guide

University

35 Qs

Electrical - Module 10 - Electrical Construction Docs

Electrical - Module 10 - Electrical Construction Docs

12th Grade

41 Qs

END OF TERM EXAM FORM 4 TERM 3

END OF TERM EXAM FORM 4 TERM 3

9th Grade

40 Qs

Architecture and Construction final

Architecture and Construction final

9th - 12th Grade

41 Qs

Design Modeling Sketching GTT

Design Modeling Sketching GTT

6th - 7th Grade

45 Qs

Design Documentation

Design Documentation

9th - 12th Grade

36 Qs

Engineering Drawings

Engineering Drawings

9th - 10th Grade

42 Qs

L3 Core 07 Analysing technical information, quantities and c

L3 Core 07 Analysing technical information, quantities and c

Assessment

Quiz

Other

KG - University

Medium

Used 156+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Who draws/creates the plans?
The architect
Builder
Quantity Surveyor
Customer

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A scale for a block plan is?
1:2500 and 1:1250. 
1:100 and 1:1250
1:100 and 1:200 
1:500 and 1:1000

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following are contract documents?
drawings, specifications and phone allowance 
Car leasing and ground rentals
drawings, specification and conditions of contract schedule
Bill of rights and council orders

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The main purpose of a specification is to give you;
a full list of materials that is required  for tender
Information that the drawings cannot
a good image when you are going through tender
Names and address of all builders and clients

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the purpose of the bill of quantities?
every thing that isn't in the dawings
the collective name for all the drawings
a time list of when all the jobs have to be completed by
An in depth price for all materials

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is a penalty clause?
To see exactly what is involved with the job
If the job overruns the contractor have to pay a fee
if you break anything its what you have to pay
A fee the contactor has to pay if he misses dinner time

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What does the approved document A cover?
Loading, ground movement and disproportionate collapse
foundations
working at heights
Health and safety

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?