UPC Chapter 6

UPC Chapter 6

12th Grade - University

55 Qs

quiz-placeholder

Similar activities

Deep Diving

Deep Diving

5th Grade - University

50 Qs

CS_Blood Pressure

CS_Blood Pressure

10th - 12th Grade

58 Qs

The Atmosphere

The Atmosphere

4th Grade - University

51 Qs

Earth Space Review

Earth Space Review

8th Grade - University

50 Qs

NCFE Earth Science Midterm

NCFE Earth Science Midterm

9th - 12th Grade

54 Qs

UPC Chapter 12

UPC Chapter 12

12th Grade - University

53 Qs

Cardiovascular System

Cardiovascular System

11th - 12th Grade

50 Qs

SCUBA Open Water Test Practice

SCUBA Open Water Test Practice

5th Grade - University

50 Qs

UPC Chapter 6

UPC Chapter 6

Assessment

Quiz

Other Sciences

12th Grade - University

Medium

Used 68+ times

FREE Resource

55 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The code requirement for "an adequate supply of potable running water" is for ______.
Cleansing and sanitation
Protection of trap seals
Water-cooled equipment
Hydronic systems

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The primary reason for installing backflow prevention assemblies is to ______.
Prevent excessive pressure
Prevent mixing of hot and cold water
Prevent pollution or contamination of the potable water supply
Prevent scalding

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Ballcocks in water closet tanks shall be installed so that the critical level of the water inlet is above the full opening of the overflow pipe at least ______ inch(es).
1/2
1
3
6

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The minimum height of the atmospheric vacuum breaker above the highest part of a urinal equipped with a flushometer valve:______ inch(es).
1
3
6
12

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The minimum height of the atmospheric vacuum breaker above the overflow rim of a vat: ______ inch(es).
1
2
6
12

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The minimum height of the atmospheric vacuum breaker above all downstream piping for lawn sprinkler system atmospheric vacuum breakers: ______ inch(es).
1
6
12
24

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

PEX tubing shall not be installed within the first ______ inches of piping connected to a water heater.
12
18
24
36

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?