Occ 33 Construct complex masonry strucures

Occ 33 Construct complex masonry strucures

KG - Professional Development

18 Qs

quiz-placeholder

Similar activities

PGA Tour 2020-2021 Quiz

PGA Tour 2020-2021 Quiz

Professional Development

15 Qs

REVISION5(SEE)_MEANS OF TRANSPORT_MCQ/OBJECTIVE_(25.01.21)

REVISION5(SEE)_MEANS OF TRANSPORT_MCQ/OBJECTIVE_(25.01.21)

3rd Grade

20 Qs

जोड़ाक्षर अभ्यास -1, lll rd Language. Hindi

जोड़ाक्षर अभ्यास -1, lll rd Language. Hindi

3rd Grade

20 Qs

IPL 2020 Quiz !!

IPL 2020 Quiz !!

KG - Professional Development

20 Qs

Reglas de acentuación

Reglas de acentuación

8th Grade

15 Qs

General Knowledge

General Knowledge

1st Grade

15 Qs

Disney Personalities

Disney Personalities

5th Grade - University

15 Qs

THEORY OF FOOD

THEORY OF FOOD

University

20 Qs

Occ 33 Construct complex masonry strucures

Occ 33 Construct complex masonry strucures

Assessment

Quiz

Other

KG - Professional Development

Medium

Used 75+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Once complete a section of plinth work during the summer at the base of the building, why is it necessary to cover the work before continuing with the building of the structure?

To eliminate the possibility of mortar droppings staining the plinth work

Protect from frost attack

Allow scaffold poles to be placed on the plinth work

To allow excess mortar from the joints to drop from the work above

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A site manager has identified an arch that requires re-pointing. A tower scaffold has been made available to access the work, where would the information relating to 'maximum load' permitted be found

Manufacturers information

Site diary

Materials specification

Variation order

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following British Standards governs the production of technical drawings in the construction industry?

BS1142

BS1192

BS2142

BS2192

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When a discrepancy is identified on a working drawing, what action should be taken?

Measure off the drawing with a scale rule

Ignore the drawing and build anyway

Discuss the measurement shown on drawing with the supervisor

Estimate the correct measurement

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A brick bonded pier cap has been damaged by frost. In order to ensure the correct materials are used to rebuild the cap, which brick would offer BEST protection against frost?

Wire cut

Hand made sand faced

Class A engineering

LBC

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When producing a full size drawing for setting out an axed semi circular arch, the voussiers are marked out on the;

Extrados

Skewback

Rise

Soffit

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

An architect has drawn the details of an arch required in a new three storey house, the architect has stipulated that the arch must be axed. What does this mean?

The bricks are cut with an axe

The bricks in the arch are cut to wedge shape

The joints between the arch are wedge shape

The bricks and the joints are wedge shape

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?