Occ 33 Construct complex masonry strucures

Occ 33 Construct complex masonry strucures

KG - Professional Development

18 Qs

quiz-placeholder

Similar activities

SM2 Foot and Ankle Test Review

SM2 Foot and Ankle Test Review

9th - 12th Grade

20 Qs

Bone Joints and more

Bone Joints and more

11th - 12th Grade

20 Qs

Fingerprints

Fingerprints

12th Grade

13 Qs

anatomy

anatomy

KG

20 Qs

Cardiovascular Endurance, Muscular Endurance and Strength

Cardiovascular Endurance, Muscular Endurance and Strength

6th - 8th Grade

15 Qs

2025 Types of Bridges Quiz

2025 Types of Bridges Quiz

7th Grade - University

14 Qs

Bridges!

Bridges!

6th Grade

20 Qs

Structural Engineering

Structural Engineering

6th - 12th Grade

18 Qs

Occ 33 Construct complex masonry strucures

Occ 33 Construct complex masonry strucures

Assessment

Quiz

Other

KG - Professional Development

Medium

Used 75+ times

FREE Resource

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Once complete a section of plinth work during the summer at the base of the building, why is it necessary to cover the work before continuing with the building of the structure?

To eliminate the possibility of mortar droppings staining the plinth work

Protect from frost attack

Allow scaffold poles to be placed on the plinth work

To allow excess mortar from the joints to drop from the work above

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A site manager has identified an arch that requires re-pointing. A tower scaffold has been made available to access the work, where would the information relating to 'maximum load' permitted be found

Manufacturers information

Site diary

Materials specification

Variation order

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following British Standards governs the production of technical drawings in the construction industry?

BS1142

BS1192

BS2142

BS2192

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When a discrepancy is identified on a working drawing, what action should be taken?

Measure off the drawing with a scale rule

Ignore the drawing and build anyway

Discuss the measurement shown on drawing with the supervisor

Estimate the correct measurement

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A brick bonded pier cap has been damaged by frost. In order to ensure the correct materials are used to rebuild the cap, which brick would offer BEST protection against frost?

Wire cut

Hand made sand faced

Class A engineering

LBC

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When producing a full size drawing for setting out an axed semi circular arch, the voussiers are marked out on the;

Extrados

Skewback

Rise

Soffit

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

An architect has drawn the details of an arch required in a new three storey house, the architect has stipulated that the arch must be axed. What does this mean?

The bricks are cut with an axe

The bricks in the arch are cut to wedge shape

The joints between the arch are wedge shape

The bricks and the joints are wedge shape

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?