1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Once complete a section of plinth work during the summer at the base of the building, why is it necessary to cover the work before continuing with the building of the structure?

To eliminate the possibility of mortar droppings staining the plinth work

Protect from frost attack

Allow scaffold poles to be placed on the plinth work

To allow excess mortar from the joints to drop from the work above

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A site manager has identified an arch that requires re-pointing. A tower scaffold has been made available to access the work, where would the information relating to 'maximum load' permitted be found

Manufacturers information

Site diary

Materials specification

Variation order

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following British Standards governs the production of technical drawings in the construction industry?

BS1142

BS1192

BS2142

BS2192

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When a discrepancy is identified on a working drawing, what action should be taken?

Measure off the drawing with a scale rule

Ignore the drawing and build anyway

Discuss the measurement shown on drawing with the supervisor

Estimate the correct measurement

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A brick bonded pier cap has been damaged by frost. In order to ensure the correct materials are used to rebuild the cap, which brick would offer BEST protection against frost?

Wire cut

Hand made sand faced

Class A engineering

LBC

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When producing a full size drawing for setting out an axed semi circular arch, the voussiers are marked out on the;

Extrados

Skewback

Rise

Soffit

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

An architect has drawn the details of an arch required in a new three storey house, the architect has stipulated that the arch must be axed. What does this mean?

The bricks are cut with an axe

The bricks in the arch are cut to wedge shape

The joints between the arch are wedge shape

The bricks and the joints are wedge shape

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?