PART 5 (DIPLOMA)

PART 5 (DIPLOMA)

University

40 Qs

quiz-placeholder

Similar activities

BUDGETING

BUDGETING

University

40 Qs

Pokémon Quizziz time!

Pokémon Quizziz time!

KG - Professional Development

37 Qs

Esqueleto axial

Esqueleto axial

University

40 Qs

Culture Awareness

Culture Awareness

University

35 Qs

TUTORIAL GAIT

TUTORIAL GAIT

University

45 Qs

Examination  of Introduction to Information Technology

Examination of Introduction to Information Technology

University

35 Qs

DERECHO CONSTITUCIONAL I

DERECHO CONSTITUCIONAL I

University

41 Qs

Crystal structure and defect

Crystal structure and defect

University

40 Qs

PART 5 (DIPLOMA)

PART 5 (DIPLOMA)

Assessment

Quiz

Other

University

Easy

Created by

Tesla’s Hub

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which method of installing a cable in a building void is permitted?


Hint: SBC Table 52-2

on insulators

in skirting trunking

without fixings

on a support wire

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which area is regarded as a medical location in the Saudi Building regulations?


Hint: SBC Chapter 710

Doctor's reception area

Hospital waiting room

Children's nursery

Treatment room

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What is classified as a hazardous location in Saudi Building regulations?


Hint:

SBC definitions

SBC Table 721-1

an area where there is inert gas present

an area where there are explosive gas present

an area containing rotating machinery

an area containing switchgear

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Where can underground cables without additional protection be used in a caravan park?

anywhere in the park, if buried at least 300 mm deep

only in areas where there is caravan traffic

only within caravan pitch area

outside the area of a caravan pitch

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which installation method is suitable for an underground system?

thermosetting insulated and sheathed cable laid directly in the ground

thermosetting insulated steel wired armoured cable laid directly in the ground

thermoplastic insulated cable installed directly in a concrete duct

thermosetting insulated and sheated flexible cable in a steel conduit

6.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What is the maximum permitted voltage to earth for a reduced low voltage single-phase system used on a construction site?


Hint: SBC 704: 41-0.3

220 V

110 V

55 V

25 V

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What color is used to identify Line 2 of a three-phase power circuit?

blue

black

brown

gray

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?