Site preparation unit 005

Quiz
•
Special Education
•
Professional Development
•
Medium
Used 106+ times
FREE Resource
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the phrase used for when plumbers start work and notch out and drill joist and put pipes under floors
Pre-plumbing
First fixing
Second fixing
Phase 1
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one of the following parts of the Building Regulations deals with building structural strength
Part G
Part C
Part E
Part A
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When drilling or notching floor joist for pipework what building regulation needs to be consulted and followed
Building regulation part D
Building regulation part A
Building regulation part L
Building regulation part C
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. Which one of the following is the correct vertical clipping interval for 15 mm copper tube?
1200mm
80mm
1000mm
1.8m
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of screw head is this
Plussie
Pozziedrive
Philips
Crosshead
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. Which one of the following grades of copper is not suitable for bending?
R290
R300
R220
R250
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are these spanners used for
Changing an immersion heater
Tightening up LCS threaded fittings
Tightening and undoing taps on basins, sinks and baths
Tightening compression pipe fittings
Create a free account and access millions of resources
Similar Resources on Wayground
Popular Resources on Wayground
10 questions
Video Games

Quiz
•
6th - 12th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
25 questions
Multiplication Facts

Quiz
•
5th Grade
10 questions
UPDATED FOREST Kindness 9-22

Lesson
•
9th - 12th Grade
22 questions
Adding Integers

Quiz
•
6th Grade
15 questions
Subtracting Integers

Quiz
•
7th Grade
20 questions
US Constitution Quiz

Quiz
•
11th Grade
10 questions
Exploring Digital Citizenship Essentials

Interactive video
•
6th - 10th Grade