1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the phrase used for when plumbers start work and notch out and drill joist and put pipes under floors

Pre-plumbing

First fixing

Second fixing

Phase 1

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following parts of the Building Regulations deals with building structural strength

Part G

Part C

Part E

Part A

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

When drilling or notching floor joist for pipework what building regulation needs to be consulted and followed

Building regulation part D

Building regulation part A

Building regulation part L

Building regulation part C

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. Which one of the following is the correct vertical clipping interval for 15 mm copper tube?

1200mm

80mm

1000mm

1.8m

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What type of screw head is this

Plussie

Pozziedrive

Philips

Crosshead

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. Which one of the following grades of copper is not suitable for bending?

R290

R300

R220

R250

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What are these spanners used for

Changing an immersion heater

Tightening up LCS threaded fittings

Tightening and undoing taps on basins, sinks and baths

Tightening compression pipe fittings

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?