Envelope system

Envelope system

11th - 12th Grade

15 Qs

quiz-placeholder

Similar activities

Pemilu

Pemilu

KG - University

10 Qs

Alberta Natural Resources #2

Alberta Natural Resources #2

KG - University

12 Qs

UTBK TPS 2

UTBK TPS 2

12th Grade

20 Qs

Las letras mayúsculas y minúsculas

Las letras mayúsculas y minúsculas

11th Grade

15 Qs

Cougar Cafe Trivia 8.27.2021

Cougar Cafe Trivia 8.27.2021

9th - 12th Grade

20 Qs

las palabras según el Acento.

las palabras según el Acento.

1st - 12th Grade

15 Qs

BSMM SMKTD2 - khemah & pemasangan

BSMM SMKTD2 - khemah & pemasangan

7th - 11th Grade

13 Qs

vehicle transmission and driveline units(a)

vehicle transmission and driveline units(a)

KG - 12th Grade

10 Qs

Envelope system

Envelope system

Assessment

Quiz

Other

11th - 12th Grade

Practice Problem

Easy

Created by

Phillip McCraw

Used 28+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Installing windows and exterior doors in a house is the final step in _____.

. drying-in

envelope sealing

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For maximum energy efficiency in a structure, air infiltration is controlled by properly applying and sealing

_____.

rigid insulation

building wrap

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing building wrap on a structure, all overlaps should be _____.

3" to 6"

6" to 12"

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To meet IRC requirements, the maximum sill height above the floor of an egress window is _____.

. 36"

44"

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Nailing flanges are not found on the outside of _____.

. wood windows

metal windows


6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When checking a window opening for squareness, you would use a _____.

laser level

framing square

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To allow for settling, the space allowed between the rough header and window head jamb should be _____.

1/4" to 1/2"

. 5/16" to 5/8"

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?