Site preparation for plumbers  level 2

Site preparation for plumbers level 2

Professional Development

16 Qs

quiz-placeholder

Similar activities

Detektor KCKT

Detektor KCKT

Professional Development

20 Qs

Götti-Schulung

Götti-Schulung

Professional Development

12 Qs

Prarambh Batch Pre Test

Prarambh Batch Pre Test

Professional Development

20 Qs

SOAL LENGKUNG

SOAL LENGKUNG

Professional Development

15 Qs

F.A., ELECTRICAL & STEERING -TEST

F.A., ELECTRICAL & STEERING -TEST

Professional Development

21 Qs

pemeliharaan mesin sepeda motor

pemeliharaan mesin sepeda motor

Professional Development

11 Qs

Semboyan eddy

Semboyan eddy

Professional Development

21 Qs

CLAIMS AWR

CLAIMS AWR

Professional Development

20 Qs

Site preparation for plumbers  level 2

Site preparation for plumbers level 2

Assessment

Quiz

Special Education

Professional Development

Medium

Used 78+ times

FREE Resource

16 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the piece of equipment and what is it used for

Drain test kit- used to test drains and soilpipes for soundness

U gauge for testing gas pipework for soundness

U gauge for testing water pressure

U gauge for testing water systems for leaks

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What are these drills used for drilling into

Wood

Steel

Brickwork

Ceramic Tiles

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the piece of equipment used for

Generator to produce electricity

Pipe freezing kit to freeze pipes

Transformer to decrease voltage from 230-110-V

Powerflush kit to remove sludge from a heating system

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum depth you can notch a joist

1/2

1/16

1/4

1/8

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the maximum size hole you can drill in a joist and where should it be drilled

1./4 of the joist depth 1/3 of the way down

1/3 of the joist depth 1/3 of the way up

1/4 of the joist depth in the centre of the joist

1/2 of the joist depth in the centre

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Why is it important top protect copper pipework with a protective sleeve in concrete floors and screeds

To avoid the pipes getting crushed

To retain heat

To prevent the pipes from corrosion

To make it easier to remove the pipes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When passing a pipe through a solid wall what should happen to the pipe

Wrap it in Denso tape

Sleeve it into another piece of the same pipe the next size up

Place some insulation over the pipe

Sleeve it into another piece of the same pipe two sizes up

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?