Reading Commercial Drawings

Reading Commercial Drawings

9th Grade - University

29 Qs

quiz-placeholder

Similar activities

Budowa Środków Transportu Lotniczego

Budowa Środków Transportu Lotniczego

University

25 Qs

Peran Pelaku Ekonomi

Peran Pelaku Ekonomi

10th Grade

25 Qs

Professional Selling Module 1

Professional Selling Module 1

University

24 Qs

Asesmen Pancasila Kelas VI

Asesmen Pancasila Kelas VI

6th Grade - University

25 Qs

EVALUACIÓN FINAL MATE, LENGUA E INGLÉS

EVALUACIÓN FINAL MATE, LENGUA E INGLÉS

9th - 10th Grade

25 Qs

ESSCA S5

ESSCA S5

University

25 Qs

Floriculture Questions 126-150

Floriculture Questions 126-150

9th - 12th Grade

25 Qs

La educación Prehispánica hasta la época de la Colonia

La educación Prehispánica hasta la época de la Colonia

University

25 Qs

Reading Commercial Drawings

Reading Commercial Drawings

Assessment

Quiz

Other

9th Grade - University

Medium

Created by

Kevin Goins

Used 12+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

29 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You would know you were looking at a set of plumbing drawings if you saw the code letter​ _____ on them.

X

P

S

E

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following ​would ​not be found on a site​ plan?

Contour lines

Roads and sidewalks

Structure elevations

Building locations

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If you wanted to see what a building looked like if viewed from the​ street, look at​a(n) _____ drawing.

Civil

Structural

Architectural

Mechanical

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important for plumbers to be familiar with mechanical drawings that show HVAC​ equipment?

You have to have intimate knowledge of all other trades and the drawings they use.

The plumbing and HVAC trades are very similar.

You may want to become an HVAC technician someday.

You may be required to connect pipe to the HVAC equipment.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A design engineer will issue a change order in response to a request for information.

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following ​would not​ appear on a​ schedule?

Model number

The manufacturer of the item

Cost of the item

Dimensions

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before roughing in a new​ WC, obtain​ _____.

Approved submittal data

Your​ supervisor's approval

A reciprocating saw

A plumbing fixture schedule

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?