Central heating revision level 2

Central heating revision level 2

Professional Development

12 Qs

quiz-placeholder

Similar activities

My Energy-IQ

My Energy-IQ

Professional Development

10 Qs

Quiz: Observing workplace hygiene procedures

Quiz: Observing workplace hygiene procedures

KG - Professional Development

15 Qs

WS 11 ACSA

WS 11 ACSA

Professional Development

10 Qs

Perawatan Kapal Mid Semester Ganjil

Perawatan Kapal Mid Semester Ganjil

11th Grade - Professional Development

10 Qs

Seberapa Rucika-nya Kamu?

Seberapa Rucika-nya Kamu?

Professional Development

13 Qs

Mould Technology 01-09-2020

Mould Technology 01-09-2020

Professional Development

10 Qs

Aircraft fuel system

Aircraft fuel system

Professional Development

10 Qs

Operative Hysteroscopy

Operative Hysteroscopy

Professional Development

10 Qs

Central heating revision level 2

Central heating revision level 2

Assessment

Quiz

Special Education

Professional Development

Medium

Used 277+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. Which one of the following documents in the building regulations covers the conservation of fuel and power in domestic properties?

Part L3.

Part L4

Part L1

Part L2

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. An automatic bypass valve is activated by the

boiler being shutting off

programmer being switched on

pressure of the incoming water service

pressure created within the system

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. The main reason a radiator should be installed 150 mm above floor level is to

reduce the risk of fire

allow the heat to circulate

protect the flooring from possible leaks

allow easier access for maintenance work

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. A thermostatic radiator valve opens and closes as a result of the temperature of the

boiler thermostat

room it is installed in

stored hot water

water in the heating system

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. A pump should be positioned so that the heating system is operating under

no pressure

positive pressure

both positive and negative pressure

negative pressure

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When soundness testing a rigid pipe system, the test pressure should be

1 ½ times the maximum working pressure

2 times the maximum working pressure

2½ times the maximum working pressure

10 times the maximum working pressure

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. Installing an air separator allows which one of the following to take place?

Close coupling of the flow and return connections.

Close coupling of the pump and the vent connections.

Close coupling of the cold feed and vent connections.

Close coupling of the motorised valve connection

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?