Level 2 Plumbing - Hot Water

Level 2 Plumbing - Hot Water

12th Grade - Professional Development

43 Qs

quiz-placeholder

Similar activities

Hot Water System Quiz

Hot Water System Quiz

12th Grade

42 Qs

unit 113 heating part 1

unit 113 heating part 1

12th Grade

43 Qs

Meteorology Unit 2: Greenhouse/Atmosphere Test

Meteorology Unit 2: Greenhouse/Atmosphere Test

9th - 12th Grade

40 Qs

OXYACETYLENE WELDING UNIT QUIZ

OXYACETYLENE WELDING UNIT QUIZ

9th - 12th Grade

40 Qs

Phase 2 306 Hot Water checkpoint quiz

Phase 2 306 Hot Water checkpoint quiz

Professional Development

40 Qs

Ph1 302 Common processes and techniques checkpoint test

Ph1 302 Common processes and techniques checkpoint test

Professional Development

40 Qs

Cold Water Mock 2

Cold Water Mock 2

12th Grade

45 Qs

Hot Water System Quiz

Hot Water System Quiz

12th Grade

38 Qs

Level 2 Plumbing - Hot Water

Level 2 Plumbing - Hot Water

Assessment

Quiz

Other, Life Skills

12th Grade - Professional Development

Medium

Created by

Cameron Cook

Used 67+ times

FREE Resource

43 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

What are two things that WRAS does?

Publishes the water regulations guides

Lists approved fittings

Controls the water supply

Offers guidance

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is centralised hot water system?

When water is heated and/or stored centrally in the building and is distributed from that point to all hot water outlets

When water is heated and/or stored locally to one specific draw-off point area

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a localised hot water system?

Where water is heated and/or stored locally to one specific draw-off point area.

Where water is heated and/or stored centrally in the building and is distributed from that point to all hot water outlets.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What gives an open vented system it's working pressure?

The head height of the CWSC

The flow rate

The size of the pipe

The temperature

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

BS6700 states that an open vent must be a minimum of ____ and have no valves in it

15mm

22mm

28mm

32mm

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The hot distribution pipe should be a minimum of _____ long before it connects to the vent pipe

450mm

650mm

22mm

350mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The primary function of the vent pipe is to act as a what?

Safety device

Temperature control

Cooling device

Stop tap

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?