Unit 107

Unit 107

Professional Development

31 Qs

quiz-placeholder

Similar activities

Machinist Grinder 4th Sem  Module 7 : CNC Safety and M/c Element

Machinist Grinder 4th Sem Module 7 : CNC Safety and M/c Element

Professional Development

26 Qs

Listening in Communication

Listening in Communication

12th Grade - Professional Development

26 Qs

Google Docs

Google Docs

Professional Development

26 Qs

Ed. Civica 4E

Ed. Civica 4E

11th Grade - Professional Development

27 Qs

IPC

IPC

Professional Development

30 Qs

BCE Masters

BCE Masters

Professional Development

27 Qs

VIVO S1pro Assessment

VIVO S1pro Assessment

University - Professional Development

30 Qs

Special Quiz on Bank's Learners Day- 21/11/2022

Special Quiz on Bank's Learners Day- 21/11/2022

Professional Development

35 Qs

Unit 107

Unit 107

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Neil Dartnall

Used 17+ times

FREE Resource

31 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The title given to a person responsible for

carrying out an initial verification is:

Inspector

Tester

Verifier

Technician

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to BS7671, the qualification level of the person carrying out an initial verification is a:

trained person

qualified person

skilled person

responsible person

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to BS7671, a person who is NOT trained as an electrician is

an ordinary person

a member of the public

an untrained person

an unauthorised person

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The responsibility level for the person carrying out an initial verification is:

technical officer

site supervisor

responsible person

duty holder

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The need for an electrical system to be maintained in a safe condition is stated in:

The Electrical Equipment Safety Regulations

The Maintenance of Electrical Supply Regulations

The Electricity at Work Regulations

Electricity Safety, Quality and Continuity Regulations

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The main steps of safe isolation are:

Identify and isolate electrical supply, verify

all circuits from consumer unit are dead, verify then re-verify and re-verify approved voltage indicator

Identify and isolate electrical supply,

select approved voltage indicator and verify, verify that circuit is dead, re-verify test instrument

Lock off electrical supply, select approved hand

tools, verify that circuit is dead, commence work on circuit

Identify and isolate electrical supply, select

approved voltage indicator and verify, verify that circuit is dead

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following sets of tests require

safe isolation?

Continuity of cpc, continuity of ring final

circuit, earth electrode test

Insulation resistance, Ze, continuity of ring

final circuit

Continuity of cpc, continuity of ring final

circuit, earth electrode test, Zs

RCD tests, Ze, polarity, insulation resistance

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?

Discover more resources for Professional Development