Structural carcassing operations

Structural carcassing operations

5th Grade

11 Qs

quiz-placeholder

Similar activities

Leaders of The World

Leaders of The World

KG - University

10 Qs

C.F.I 70

C.F.I 70

KG - Professional Development

13 Qs

BedWars Strats

BedWars Strats

KG - Professional Development

13 Qs

Seberapah kenalkah

Seberapah kenalkah

1st - 6th Grade

10 Qs

2021 Quiz

2021 Quiz

KG - Professional Development

16 Qs

Kobiety w Historii

Kobiety w Historii

KG - 12th Grade

15 Qs

Guess the Gaming Pet 1

Guess the Gaming Pet 1

KG - Professional Development

12 Qs

Latihan Soal PTS PPKn

Latihan Soal PTS PPKn

KG - 12th Grade

15 Qs

Structural carcassing operations

Structural carcassing operations

Assessment

Quiz

Fun

5th Grade

Practice Problem

Medium

Created by

kieron sear

Used 302+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The quality of the carcassing material will be stated in the:

schedule

specification

drawing

programme of work

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is the BEST method of storage for joist materials?

On the ground, evenly supported, well ventilated under a breathable cover.

On bearers, evenly supported, well ventilated under a breathable cover.

On bearers, evenly supported, well ventilated in the open.

On bearers, stacked tightly together, under a plastic sheeting.

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following saws would NORMALLY be used to cut a joist to length?

hack saw

tenon saw

coping saw

cross cut saw

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the HIGHEST risk when carrying out structural carcassing?

Inhalation of MDF dust.

Trench collapse.

Being hit by moving vehicles.

Falls from height.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following item of PPE MUST be worn when working on roof construction?

(i) Respirator. (ii) Hard hat. (iii) Boots. (iv) Hi visibility jacket.

(ii) and (iii) only.

(iii) and (iv) only.

(ii), (iii) and (iv) only.

(i), (ii), (iii) and (iv).

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

How far from the gable wall should the first truss rafter be positioned?

10mm

30mm

50mm

100mm

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When forming an opening for a roof light in truss rafter roofs:

trusses should be cut to allow for size of light.

a gap should be left to fit the light between two trusses.

trusses should be fix at the same centres as all other trusses.

adjacent trusses should be doubled up.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?