Construction Information,Drawings and symbols.

Construction Information,Drawings and symbols.

8th Grade

18 Qs

quiz-placeholder

Similar activities

BÀI SỐ 1 CN 8

BÀI SỐ 1 CN 8

8th Grade

20 Qs

Cambio técnico y cambio social

Cambio técnico y cambio social

8th Grade

15 Qs

3-D Printing Applications

3-D Printing Applications

8th Grade

15 Qs

Programmation en bloc, les variables, les sous-programmes

Programmation en bloc, les variables, les sous-programmes

8th Grade

14 Qs

Test d'ingresso su alimentazione

Test d'ingresso su alimentazione

7th - 8th Grade

15 Qs

impianto termico

impianto termico

7th - 8th Grade

14 Qs

Sistemas operativos Formateo y Drivers

Sistemas operativos Formateo y Drivers

1st - 12th Grade

14 Qs

Construction Information,Drawings and symbols.

Construction Information,Drawings and symbols.

Assessment

Quiz

Instructional Technology

8th Grade

Practice Problem

Medium

Created by

Kevin Etchells

Used 453+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The drawing shown would be known as?

a Component Range drawing.

an Elevation drawing.

a Plan drawing.

a Block plan.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

A Block plan drawing would usually be produced to which of the following scale ratio's?

1:100

1:500

1:2500

1:10

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The British Standard code for drawings is;

BS1969

BS1192

BS1945

BS1066

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The sign shown is the sign to show a what?

Boundary

Datum

Ley line

Horizon.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

When you see this sign on a drawing which direction is it identifying?

South

West

North

East

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Which member of the building team will prepare a Bill of Quantities?

The Project Manager.

The Quantity Surveyor

The Site Engineer.

The Clerk of Works.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When an operative receives a delivery on site which document must be checked prior to the delivery being accepted?

The Manufacturers Instructions.

The Delivery Note.

The Bill of Quantities.

The Specification.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?