
Setting out
Authored by Simon McKee
Other, Architecture
12th Grade
Used 128+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE SELECT QUESTION
1 min • 1 pt
Which of the following scales are usually used for block plans?
1:500
1:200
1:2500
1:5
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following common abbreviations are you not likely to see on a drawing?
Bwk
UPVC
Rwg
Svp
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which organisation would usually be involved in determining the building line?
Local authority
Ordnance Survey
Trading Standards
British Standards
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who would normally be responsible for reconnecting services on a construction site?
The main contractor
The architect
Local authority
The service provider
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
At what height is the girth or thickness of trees or plants usually measured from ground level?
0.5m
1m
1.5m
2m
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the term used to describe a fixed point on a construction site against which all other levels can be measured?
Site datum point
Site peg
Site post
Site midway position
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which shape is most closely associated with the 3:4:5 measurement of right-angled corners?
A square
An oval
A triangle
A circle
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?