Manufacturing routine joinery products

Manufacturing routine joinery products

1st Grade

20 Qs

quiz-placeholder

Similar activities

ALWAYS REJOICE RC Part 3

ALWAYS REJOICE RC Part 3

KG - 12th Grade

17 Qs

Managemen Risiko

Managemen Risiko

1st Grade - University

20 Qs

Thanksgiving Quiz Gr.3

Thanksgiving Quiz Gr.3

1st - 5th Grade

15 Qs

Adopt Me

Adopt Me

1st - 12th Grade

15 Qs

Todo lo que tienes que aprender hoy

Todo lo que tienes que aprender hoy

1st Grade

20 Qs

Harry Potter and the Chamber of Secrets

Harry Potter and the Chamber of Secrets

KG - Professional Development

16 Qs

Colours

Colours

1st Grade

15 Qs

Visual Arts -Form 1s

Visual Arts -Form 1s

1st - 12th Grade

20 Qs

Manufacturing routine joinery products

Manufacturing routine joinery products

Assessment

Quiz

Fun

1st Grade

Hard

Created by

Steve Jones

Used 60+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is not a health hazard?

Dust

Noise

Saw blades

Musculoskeletal

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What scale are workshop rods usually drawn?

1:1

1:5

1:20

1:250

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Name a document that is used for additional information that go's along-side of an architect's drawing?

Specification

Job sheet

Schedule

Building regulations

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What's does the term 'nominal size' mean?

Standard timber dimensions

The planed timber dimensions

The saw timber dimension before machining

The total length of timber required

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What Building regulation controls the rise and going of a staircase?

Approved document A

Approved document E

Approved document G

Approved document K

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a discrepancy is discovered between the setting out drawing and the building regulations, what action should you take?

Contact the structural engineer

Contact the architect

Report the issue to your line manager or supervisor

Amend the drawing

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When should a cutting list be produced?

After the setting out has been completed and checked

Before producing the rod

As soon as you receive the specification

As soon as you receive the elevation drawings from the architect

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?