Construct Solid Walling incorporating isolated piers

Construct Solid Walling incorporating isolated piers

12th Grade

15 Qs

quiz-placeholder

Similar activities

Foreign exchange

Foreign exchange

12th Grade

10 Qs

GDCD 6 - BÀI TẬP TRẮC NGHIỆM - BÀI 1,2

GDCD 6 - BÀI TẬP TRẮC NGHIỆM - BÀI 1,2

6th Grade - University

20 Qs

Skeletal System (Unit 6)

Skeletal System (Unit 6)

9th - 12th Grade

20 Qs

Reviewing Related Literature

Reviewing Related Literature

12th Grade

10 Qs

super ultra quiz!

super ultra quiz!

1st Grade - University

10 Qs

Latar belakang kedatangan bangsa Eropa ke Indonesia

Latar belakang kedatangan bangsa Eropa ke Indonesia

KG - University

10 Qs

Ecosistema Emprendedor

Ecosistema Emprendedor

12th Grade

11 Qs

ABOUT TÜRKİYE

ABOUT TÜRKİYE

6th - 12th Grade

13 Qs

Construct Solid Walling incorporating isolated piers

Construct Solid Walling incorporating isolated piers

Assessment

Quiz

Other

12th Grade

Practice Problem

Medium

Created by

Phil Hodgkinson

Used 19+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to cover completed work at the end of the day?

To protect from adverse weather conditions

To make the completed job look presentable

To adhere to legislation

To ensure the site is safe

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

From which document would a site manager identify plot 32 on a building site?

Variation order

Method statement

Risk assessment

Site plan

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During construction operations, what is the BEST way to protect solid walling and isolated piers from damage?

Erect a suitable barrier

Cover the work with polythene

Place a sign near to completed work

Tell the work force to be careful

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How wide is a one brick thick wall?

102 mm

200 mm

215 mm

300 mm

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Place these five steps in the correct order to complete a risk assessment.

A - Review the risk assessment and update if necessary

B - Identify the hazards

C - Evaluate the risks and decide on precautions

D - Decide who might be harmed and how


E - Record the findings and implement them

a. A, C, E, B, D.

b. E, A, C, D, B.

c. B, D, C, E, A

d. B, C, E, D, A.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To avoid unnecessary cutting when setting out a solid wall on a concrete foundation, what action should be taken?

Build the wall and have bigger cross joints

Make sure you put the cut in the middle of the wall

Measure the wall and dry bond before work commences

Make sure the wall fits to either end of the foundation

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is broken bond BEST placed when constructing a dwelling?

Below the DPC

At the quoin

Under a door or window

Next to a reveal

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?