Construct Solid Walling incorporating isolated piers

Construct Solid Walling incorporating isolated piers

12th Grade

15 Qs

quiz-placeholder

Similar activities

Wall Section-Lower

Wall Section-Lower

10th - 12th Grade

10 Qs

Foundations

Foundations

12th Grade

16 Qs

Blood Pressure and Heart Rate

Blood Pressure and Heart Rate

10th - 12th Grade

13 Qs

Solid Walling Situations Unit 204

Solid Walling Situations Unit 204

KG - University

10 Qs

HARDSCAPES IN THE LANDSCAPE PRE-TEST

HARDSCAPES IN THE LANDSCAPE PRE-TEST

9th - 12th Grade

10 Qs

PLTW-CEA EOC Review

PLTW-CEA EOC Review

9th Grade - University

16 Qs

Building Construction Review

Building Construction Review

9th - 12th Grade

20 Qs

Cavity Walling L2

Cavity Walling L2

10th - 12th Grade

20 Qs

Construct Solid Walling incorporating isolated piers

Construct Solid Walling incorporating isolated piers

Assessment

Quiz

Other

12th Grade

Medium

Created by

Phil Hodgkinson

Used 19+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to cover completed work at the end of the day?

To protect from adverse weather conditions

To make the completed job look presentable

To adhere to legislation

To ensure the site is safe

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

From which document would a site manager identify plot 32 on a building site?

Variation order

Method statement

Risk assessment

Site plan

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During construction operations, what is the BEST way to protect solid walling and isolated piers from damage?

Erect a suitable barrier

Cover the work with polythene

Place a sign near to completed work

Tell the work force to be careful

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How wide is a one brick thick wall?

102 mm

200 mm

215 mm

300 mm

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Place these five steps in the correct order to complete a risk assessment.

A - Review the risk assessment and update if necessary

B - Identify the hazards

C - Evaluate the risks and decide on precautions

D - Decide who might be harmed and how


E - Record the findings and implement them

a. A, C, E, B, D.

b. E, A, C, D, B.

c. B, D, C, E, A

d. B, C, E, D, A.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To avoid unnecessary cutting when setting out a solid wall on a concrete foundation, what action should be taken?

Build the wall and have bigger cross joints

Make sure you put the cut in the middle of the wall

Measure the wall and dry bond before work commences

Make sure the wall fits to either end of the foundation

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is broken bond BEST placed when constructing a dwelling?

Below the DPC

At the quoin

Under a door or window

Next to a reveal

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Other