
Managing traffic congestion
Authored by Lim Angie
Geography
8th Grade
20 Questions
Used 75+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT an advantage of an integrated transport hub shown in the photograph?
More convenient
More efficient
Different modes of transport can be accessed easily
Cut land use
2.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
Which statement best describes the image?
Integrated Public Transport Hubs can be found all over Singapore.
The eastern part of Singapore has the most transport hubs.
Yishun is the only housing estate in the North with an integrated transport hub.
In Singapore, there are 6 existing transport hubs with bus interchanges that are fully integrated with rail and retail services. Another upcoming 7 will be built to improve accessibility and speed up bus-train transfers.
3.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
All bus lanes in Singapore are full day bus lanes.
True
False
4.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
Identify 2 challenges of implementing bus lanes schemes.
More commuters will travel by buses, making them too congested.
Success depends on the compliance of drivers.
Bus lanes will encourage drivers to drive faster.
Bus lanes takes away precious road capacity.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does the following photo show?
Bus Lane in operation during peak hours.
More bus lanes.
No cars allowed.
6.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
How will Singapore's rail network change by 2040?
There is a concentration of new rail lines in Singapore's Central Region.
Accessibility has increased.
Rail networks has expanded and more locations can be reached by trains.
There are still insufficient rail networks in the Northwestern part of Singapore.
7.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
To build the new Cross Island line, land along the planned line will be acquired. What are some possible negative impacts caused by this expansion of rail network? (Multi-answers)
The planned Cross Island line may cut through housing estates and buildings.
Inconvenience caused to residents and businesses who may have to give up their property.
Prices of property affected by the planned line will fall drastically.
There will be construction noise and dust along the planned line.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
18 questions
Is Chocolate Good for the Ivory Coast?
Quiz
•
8th - 11th Grade
16 questions
Physical and Human Characteristics
Quiz
•
6th - 8th Grade
15 questions
Class 7 Geography Ch-2
Quiz
•
6th - 8th Grade
20 questions
Geografia
Quiz
•
1st - 10th Grade
16 questions
Settlements and land use
Quiz
•
8th Grade
15 questions
Name The Flag
Quiz
•
1st Grade - Professio...
20 questions
Before the Flood Check In Quiz
Quiz
•
7th - 11th Grade
20 questions
Political Systems
Quiz
•
KG - University
Popular Resources on Wayground
5 questions
This is not a...winter edition (Drawing game)
Quiz
•
1st - 5th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
10 questions
Identify Iconic Christmas Movie Scenes
Interactive video
•
6th - 10th Grade
20 questions
Christmas Trivia
Quiz
•
6th - 8th Grade
18 questions
Kids Christmas Trivia
Quiz
•
KG - 5th Grade
11 questions
How well do you know your Christmas Characters?
Lesson
•
3rd Grade
14 questions
Christmas Trivia
Quiz
•
5th Grade
20 questions
How the Grinch Stole Christmas
Quiz
•
5th Grade