Search Header Logo

DxI600/800

Authored by mohd fazli ismail

Professional Development

Professional Development

30 Questions

Used 133+ times

DxI600/800
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following cannot be added/changed during a run on DxI?

Reaction Vessels (RVs)

Substrate

Wash Buffer

All can be changed

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How long must the substrate be at room temperature before loading on the system?

at least 6 hours

at least 12 hours

at least 8 hours

at least 18 hours

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is good practice to open the substrate load door to determine if there is adequate substrate on board.

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

System Check will evaluate whether there is adequate particle mixing in the reagent pack.

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When loading substrate on the DxI, you must initiate a prime through the Diagnostics screen.

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The duckbill must be replaced every _________ tests.

500

1000

5000

10000

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

DxI detection technology?

Radioimmunoassay

ELISA

Chemiluminescence

ElectroChemiluminescence

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?