Search Header Logo

PERFORMANCE STANDARD 5.2 : IDENTIFY AND INSTALL WALL AND CEILING SYSTEMS

Authored by Jay Seiler

Life Skills

10th - 12th Grade

Used 10+ times

PERFORMANCE STANDARD 5.2 : IDENTIFY AND INSTALL WALL AND CEILING SYSTEMS
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Wall framing on a house begins after the _______ have been nailed in place

wall studs

sub floor

bottom plates

partitions

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Corner post are constructed

wherever one wall ties into another

at corners and partitions

at inside corners

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of these is not a wall part

girder

stud

plate

header

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is a header placed in a wall

where the most weight or pressure is on the wall

in a wall where ever a door or window is

@ least 6-12" above the floor

close to the neck

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of a header

distributes weight across door or window opening

provides a nailing surface for sheetrock or sheathing

prevents the spread of fire

strengthen the upper section of a wall

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which part is not part of a rough opening

joist

trimmer

cripple stud

studs

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Studs are horizontal members/ pieces of a wall

True

False

Depends on blue print specifications

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?