Search Header Logo

NFPA 99: Worksheet 10

Authored by Michael Flynn

Professional Development

Used 89+ times

NFPA 99: Worksheet 10
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Inspection and testing shall be performed on all new piped gas systems, additions, renovations, temporary installations or repaired systems to ensure that all applicable provisions of NFPA 99 have been adhered to and system integrity has been achieved or maintained. What is required of the individual doing the testing or inspecting?

Have two years of experience

Have a documented procedure

Be a certified tester

None of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Breached portions of the systems subject to inspection and testing shall be confined to only the specific altered zone or area that is downstream for pressure gases at the point of intrusion. Where a system shall be declared breached?

Physical separation of pipeline

System component removal

Replacement or Addition of system components

Any of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which group or agency shall review the inspection and testing records prior to the use of all systems to assure that all findings and results of the inspection and testing have been successfully completed?

Responsible facility authority

Maintenance supervisor

Head nurse

Any of the above

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On system renovations where no piping is changed, functional testing shall be performed to assure no other equipment in the system has been adversely impacted.

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The test required by the installer shall be performed and documented prior to the system verification. The test gas shall be ___________.

source gas

oil-free dry nitrogen NF

compressed oil-free dry air

any of the above

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During the initial pressure test, the source shutoff valve shall remain closed and the test pressure for pressure gases shall be 1.5 times the system working pressure, but not less than _____________.

200 psi

150 psi

100 psi

75 psi

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The initial pressure test for the piping of a medical gas and vacuum system shall be maintained ________.

for 24 hours

until 25% of the joints have been examined for leakage

for 8 hours

until 100% of the joints have been examined for leakage

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?