NFPA 99: Worksheet 10

NFPA 99: Worksheet 10

Professional Development

30 Qs

quiz-placeholder

Similar activities

2018 Mechanical Chapter 13

2018 Mechanical Chapter 13

Professional Development

25 Qs

INTERNATIONAL FUEL GAS CODE (part 5)

INTERNATIONAL FUEL GAS CODE (part 5)

Professional Development

32 Qs

2018 IPC CH 5 Study Quiz

2018 IPC CH 5 Study Quiz

Professional Development

25 Qs

2018 IPC CH 6B Quiz

2018 IPC CH 6B Quiz

Professional Development

25 Qs

2018 Mechanical Chapter 12

2018 Mechanical Chapter 12

Professional Development

25 Qs

2018 IPC CH 6A Quiz

2018 IPC CH 6A Quiz

Professional Development

25 Qs

2018 IPC CH 6A Study Quiz

2018 IPC CH 6A Study Quiz

Professional Development

25 Qs

INTERNATIONAL FUEL GAS CODE (Part 2)

INTERNATIONAL FUEL GAS CODE (Part 2)

Professional Development

28 Qs

NFPA 99: Worksheet 10

NFPA 99: Worksheet 10

Assessment

Quiz

Professional Development

Easy

Created by

Michael Flynn

Used 89+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Inspection and testing shall be performed on all new piped gas systems, additions, renovations, temporary installations or repaired systems to ensure that all applicable provisions of NFPA 99 have been adhered to and system integrity has been achieved or maintained. What is required of the individual doing the testing or inspecting?

Have two years of experience

Have a documented procedure

Be a certified tester

None of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Breached portions of the systems subject to inspection and testing shall be confined to only the specific altered zone or area that is downstream for pressure gases at the point of intrusion. Where a system shall be declared breached?

Physical separation of pipeline

System component removal

Replacement or Addition of system components

Any of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which group or agency shall review the inspection and testing records prior to the use of all systems to assure that all findings and results of the inspection and testing have been successfully completed?

Responsible facility authority

Maintenance supervisor

Head nurse

Any of the above

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On system renovations where no piping is changed, functional testing shall be performed to assure no other equipment in the system has been adversely impacted.

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The test required by the installer shall be performed and documented prior to the system verification. The test gas shall be ___________.

source gas

oil-free dry nitrogen NF

compressed oil-free dry air

any of the above

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During the initial pressure test, the source shutoff valve shall remain closed and the test pressure for pressure gases shall be 1.5 times the system working pressure, but not less than _____________.

200 psi

150 psi

100 psi

75 psi

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The initial pressure test for the piping of a medical gas and vacuum system shall be maintained ________.

for 24 hours

until 25% of the joints have been examined for leakage

for 8 hours

until 100% of the joints have been examined for leakage

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?