Cold Water 6035 LO2

Cold Water 6035 LO2

Professional Development

15 Qs

quiz-placeholder

Similar activities

Hot water level 3 9189

Hot water level 3 9189

Professional Development

12 Qs

Phase 2 Exam prep 2

Phase 2 Exam prep 2

Professional Development

20 Qs

Cold Water Systems LO2

Cold Water Systems LO2

Professional Development

13 Qs

Bpec level 1 Hot and cold water

Bpec level 1 Hot and cold water

Professional Development

13 Qs

L2 Common Plumbing Processes PT1

L2 Common Plumbing Processes PT1

University - Professional Development

10 Qs

L3 AP Cold water P2

L3 AP Cold water P2

University - Professional Development

17 Qs

6035 | Processes LO1

6035 | Processes LO1

Professional Development

11 Qs

6035 Hot Water LO1

6035 Hot Water LO1

Professional Development

13 Qs

Cold Water 6035 LO2

Cold Water 6035 LO2

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Anthony Price

Used 119+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Grey water is safe for drinking

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What colour is MDPE?

Black

Blue

Red

Yellow

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At which point on a cold water supply system do the Water Regulations come into force?

From the Boundary stop valve

From the ferrule

From the water treatment plant

From the stop valve inside the property

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the stainless steel screen found in warning pipe connectors and cistern vents?

To prevent filtered air from entering the cistern

To prevent dead insects fro leaving the cistern in case of overflow

To prevent insects/vermin from entering the system

To provide frost protection

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the Water Regulations, where should a stop valve be placed

Inside the airing cupboard, as close as possible to the door

Under the floorboards near the front door

Inside the building, as close as possible to the entry point of the pipe.

Outside the building as close as possible to the front door

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum amount of MDPE that should be visible above floor level?

350mm

150mm

450mm

250mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where should drain off valves be placed?

At the high point of every run

Anywhere that it can't be seen

At the low point of every pipe run

None of these

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?