1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If one is unable to use joist hangers to install floor joists, what has to be cut and nailed for the joists to rest on?

Ledgers

Rafters

Studs

Top Plates

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In platform-type framing, the wall studs are nailed:

on the soleplate.

on the ledger

on the rafters

on the sills

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When Sheri is framing a building, sills are installed:

Anytime

First

Last

Sixth

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When Jan uses platform-type framing, where is the top plate attached?

above the ceiling joists

below the studs

on top of the rafters

on top of the studs

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If one end of a stud is nailed to the sole plate, where should the other end be nailed?

Ceiling Joist

Floor Joist

Foundation

top plate

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Because extra strength is needed for support, most framing lumber used for wood buildings should be:

1" thick.

2" thick.

4" thick.

6" thick.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When lumber is used for the horizontal parts of framing, where should the crown of a warped board be located?

Bottom

Left Side

Right Side

Top

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?