
Stabilizing the Scaffold
Authored by Ashley Adsit
Professional Development

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
Which of the following is not used to restrain the scaffold from tipping after the scaffold foundation has been established and while the scaffold is being erected?
guylines
cotton ropes
tie-ins
bracing
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When stabilizing the scaffold, it must be tied off at the node point, which is the strongest part of the scaffold. (True; False)
true
false
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Ties, guys, braces, or outriggers must be used to prevent tipping wherever an eccentric load is applied or transmitted to a supported scaffold. (True; False)
true
false
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a stabilizing component placed diagonally across and fastened to the vertical and horizontal members of a scaffold?
tie-in
brace
guyline
runner/ledger
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a stabilizing device used between the scaffold framework and an adjoining building or structure to increase lateral strength and rigidity?
tie-in
brace
guyline
runner/ledger
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is supporting cable used in the absence of tie-ins to help maintain the strength and rigidity of the scaffold?
tie-in
brace
guyline
runner/ledger
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Bracing is most effective when the angle of the brace between parts is approximately which of the following?
15º
25º
35º
45º
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?