1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Load factor is __________.

Maximum demand/connected load

Average load/maximum demand

Maximum demand/average load

Average load/installed capacity

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

For economy in power generation __________.

Load factor and diversity factor should be low

Plant use factor should be high

Load factor should be high

Diversity factor should be high

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A load curve is a plot of __________.

Load versus generation capacity

Load versus time

Load versus cost of power

Load versus current

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

During summer months, the increased load is due to __________.

Increased use of fans and air conditioners

Increased water supply

Increased business activities

Vacations in institutions

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Load due to a ceiling fan is nearly __________ watts.

250 to 2,000

100 to 200

40 to 80

20

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the ff utility item has the highest power rating?

Ceiling fan

Refrigerator

Mixer

Electric iron

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A power plant supplying energy to a city will usually experience peak demand from __________.

2PM to 6PM

6PM to 12 PM

Midnight to early morning

8AM to 12 noon

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?