Perform related computations-(Basic)

Perform related computations-(Basic)

10th - 12th Grade

20 Qs

quiz-placeholder

Similar activities

DofE training refresher

DofE training refresher

10th - 12th Grade

18 Qs

IPL 2020 Quiz !!

IPL 2020 Quiz !!

KG - Professional Development

20 Qs

SOSIOLOGI KELAS XI IPA / IPS

SOSIOLOGI KELAS XI IPA / IPS

12th Grade

20 Qs

Geometric Sequences

Geometric Sequences

7th - 10th Grade

20 Qs

PH Tema 5 Pertanian Level 2

PH Tema 5 Pertanian Level 2

KG - 12th Grade

20 Qs

What is Entrepreneurship?

What is Entrepreneurship?

12th Grade

20 Qs

quiz ke 2

quiz ke 2

10th Grade

20 Qs

LECCION 2 Y 3 TAQUIGRAFIA

LECCION 2 Y 3 TAQUIGRAFIA

10th - 12th Grade

20 Qs

Perform related computations-(Basic)

Perform related computations-(Basic)

Assessment

Quiz

Other

10th - 12th Grade

Practice Problem

Hard

Created by

PATRICIA GILLINGS

Used 17+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Mr. Green, who is an electrician, works 2 hours 20 minutes on Monday, 5 hours 45 minutes on Tuesday and 3 hours 50 minutes on Thursday. what is the total number of hours worked?

11 hours and 55 minutes

10 hours and 50 minutes

12 hours and 45 minutes

15 hours and 55 minutes

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Miss Wynter who is a labourer works 2 hours 20 minutes on Friday, 5 hourrs 45 minutes on Saturday. Give total hours worked

12 hours

12 1/2 hours

8 hours 5 minutes

21 hours

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the total cost os 25 welding rods at $35.60 each?

$525.60

$534.60

$890.00

$3, 560.00

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the wall thickness of a pipe with an external diameter of 149mm and an internal diameter of 98 mm?

247 mm

151 mm

51 mm

25.5 mm

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A mechanic started a job at 8.37 am. It took him 4 hours and 35 minutes to complete it. What time did he finish?

12:12 pm

12:48 pm

1:12 pm

1:48 pm

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Five pieces measuring 26, 47, 38, 27,and 32cm are cut from steel bar that was 200 cm long. Allowing for a total of 1 cm for waste in cutting, what is the length of the piece remaining?

20 cm

29cm

30 cm

39 cm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A contractor brought a new piece of machinery for $ 1, 380.00 and at the end of 2 1/2 months sold it for $ 2, 590.00. How much profit did he make?

$1,036.00

$1,210.00

$3,025.00

$3,450.00

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?