Search Header Logo

4.01-4.03 Ag Mechanics 1

Authored by Bryant Glover

Other

9th - 12th Grade

Used 10+ times

4.01-4.03 Ag Mechanics 1
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When laying out a building, taking two equal measurements of the diagonal corners means that the four corners are:

not plumb.

not square.

square

triangles

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When one fails to hold the leveling rod up straight, the measurement will be:

accurate.

inaccurate.

too short.

too small

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If Abby needs to lay out a building using the 3-4-5 method, what measurement is used with 24' and 30' to make a square corner?

18'

24'

30'

60'

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A hidden line that indicates the presence of unseen edges is shown on a drawing by a:

heavy solid line.

series of dashes.

solid line with arrows..

solid zigzag line

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where on a blueprint should one look to see what the symbols mean?

elevation

legend

revision block

title block

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is an isometric drawing used in construction plans?

to include electrical plans

to include floor plans

to show the aerial view of the structure

to show the structure as a whole

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What nail is used for fastening tongue-and-groove and finish work?

box

common

cut

roofing

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?