Highway and Transportation Eng'g

Highway and Transportation Eng'g

Professional Development

15 Qs

quiz-placeholder

Similar activities

Aula13_7ano_PL

Aula13_7ano_PL

Professional Development

10 Qs

Data Analysis

Data Analysis

Professional Development

10 Qs

N3-T56-Circunferencia trigonometrica 1 Seno y coseno - varia

N3-T56-Circunferencia trigonometrica 1 Seno y coseno - varia

Professional Development

11 Qs

STEM Education - Mathematics and Science Fundamentals

STEM Education - Mathematics and Science Fundamentals

1st Grade - Professional Development

20 Qs

N1-T75-Repaso

N1-T75-Repaso

Professional Development

11 Qs

LÓGICA MATEMÁTICA

LÓGICA MATEMÁTICA

Professional Development

10 Qs

Diagnóstico de Matemática-Sétimo año

Diagnóstico de Matemática-Sétimo año

1st Grade - Professional Development

12 Qs

ALJABAR

ALJABAR

7th Grade - Professional Development

20 Qs

Highway and Transportation Eng'g

Highway and Transportation Eng'g

Assessment

Quiz

Mathematics

Professional Development

Hard

Created by

Ronie II

Used 58+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What office is responsible for zoning of their respective jurisdictions and final land use and zoning planes to be submitted to HLURB (Housing and Land Use Regulatory Board) for approval?

Provincial Planning Development Office (PPDO)

City Planning Development Office (CPDO)

Municipal Planning and Development Office (MPDO)

All of the above

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Ideal Capacity of a road is:

1800 vehicles/hr

2000 vehicles/hr

1400 vehicles/hr

1200 vehicles/hr

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The required length of the turnout shall be determined considering a length of _____ meters for each bus.

16.0

15.5

15.0

14.5

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The length of superelevation development from the normal cross slope to the zro cross slope point on the tangent is known as:

tangent runoff

tangent runout

super elevation runout

super elevation runoff

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Criteria used for the establishment of sag vertical curves:


I. Headlight sight distance

II. Passenger comfort

III. Drainage control

IV. General appearance

V. Velocity of cars passing thru the curve

I, II, IV and V only

I, II, III and IV only

II, IV and V only

All of the above

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

They are essential part of any road that is not on fill and must be incorporated into the road cross-section. These are designed to accommodate the expected rainfall but can often be hazardous to vehicles that run off the road.

transverse drainage ditches

shoulder

drop curve and gutters

longitudinal drainage ditches

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The most important criteria to consider to avoid safety hazards created by the drainage ditches is the actual reconnaissance survey during wet whether to identify the natural run-out locations. Slopes on the side nearest the road should not be steeper than _____ and preferable flatter as this will minimize accident severity. The slope farthest from the road may be as steep as the ground will permit.

4:1

3:1

2:1

1.5:1

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?