1.

MULTIPLE SELECT QUESTION

15 mins • 1 pt

select three (3) factors that can occur environmental problems at construction site.

broken bricks

Rusty steel bar

Unused formwork

cabin office

2.

MULTIPLE SELECT QUESTION

15 mins • 1 pt

select statements that explain the meaning of environmental technology

Application of the environmental science to conserve the natural environment

Application of the environmental science to curb the negative impact of human involvement

Application of the environmental science to knock out the habitat

Application of the environmental science to make a costing report on approved project

3.

MULTIPLE SELECT QUESTION

15 mins • 1 pt

select activities which able to minimize the environmental problems at cons. site?

Recycling

Sewage treatment

Solid waste management

Air pollution control

4.

MULTIPLE SELECT QUESTION

15 mins • 1 pt

select statements that describe activities could be done by construction workers in order to have clean and healthy workplace

Apply the appropriate handling procedure for hazardous waste

Emergency planning and spill response methods

WHMIS (Workplace Hazardous Management Information Systems implementation and compliance evaluation

Apply the appropriate procedure in social distancing

5.

MULTIPLE SELECT QUESTION

15 mins • 1 pt

select factors that significant to the environmental impacts during at construction site

Water pollution

Noise pollution

Soil erosion and siltation

Unorganized storage

6.

MULTIPLE SELECT QUESTION

15 mins • 1 pt

Select statements that describe mitigation methods to decrease runoff and flooding at the construction site

Perimeter channels should be provided at site boundaries to intercept storm water runoff from outside

Water used in construction site should be recycled back to the site

Water used in ground boring should as far as practicable be recalculated after sedimentation

Perimeter channels is not necessarily needed for small area construction site

7.

MULTIPLE SELECT QUESTION

15 mins • 1 pt

Select statements describing about applications of sound level meter (SLM) as noise measurement automatic device

Spot-check noise dosimeter performance

Aid in determining the feasibility of engineering controls for individual noise sources

Evaluate hearing protectors

Identify and evaluate individual noise sources for abatement purposes

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?