Search Header Logo

EPA 608 Type 2

Authored by Mike Conway

Other

11th Grade - Professional Development

Used 53+ times

EPA 608 Type 2
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

79 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A chiller for comfort cooling that contains 50 pounds or more of R-123 is leaking. Starting in 2019, at what leak rate does the EPA require that the equipment be repaired?

5%

10%

15%

20%

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A cold storage warehouse chooses not to repair an appliance containing R-22 that is leaking above the threshold rate. How long can the facility continue to operate that appliance before it must be retrofitted or retired, assuming no extensions apply?

1 month

9 month

12 month

24 month

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A comfort-cooling appliance containing 50 pounds or more of R-22 is found to be leaking beyond the applicable leak rate threshold. Unless granted additional time, how many days do you have to repair the leak and conduct the initial leak verification test?

1 days

10 days

30 days

45 days

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A company uses a chiller that diverts 55% of its cooling capacity to one of its manufacturing lines and 45% of its cooling capacity to air condition the office spaces. Which leak rate category would this chiller be in?

Industrial process refrigeration

Ice making refrigeration

Commercial refrigeration

Comfort cooling

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A customer has an industrial process refrigeration system that contains 1000 lbs. of R-22 that has exceeded the applicable leak rate threshold. How often is the customer required to perform a leak inspection?

Every month

Every 3 month

Every 6 month

Every 12 month

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After a leak repair of a supermarket rack using 3000 lbs of R-22 and a successful initial verification test, when must a follow-up leak verification test be conducted?

The same day.

The next day.

Within 10 days.

Within 30 days.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After installation of a field piped split system, the unit should first be pressurized with;

air and leak checked.

R-22 and leak checked.

R-410A and leak checked.

nitrogen and leak checked.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?