1.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
What does cradle to cradle refer to construction project?
How a facilities is operated over a specific period of time
The environmental impact of a project from the beginning to the end of its life cycle
The process of construction of built facilities
The demolition process of built facilities at the end of project life
2.
MULTIPLE SELECT QUESTION
5 mins • 1 pt
Element of sustainable design includes:
Building orientation
Project site
Water
HVAC systems
Building envelope
3.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
- Fewer landfills, greater markets for environmentally preferable products, decrease traffic due to the use of local materials
- Improved occupants productivity, satisfaction, health and safety
- Improved comfort conditions for occupants, reduce adverse health impacts, improved occupant comfort and satisfaction, better individual productivity
Which pillar of sustainable refered to the above benefits of sustainable design?
Economy
Environment
Social
4.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
How do I get my project built?
The above question is refered to the one of the principle of sustainable construction which is ________________.
Health & Safety
Material selection
Procurement
Construction lifecycle
5.
OPEN ENDED QUESTION
5 mins • Ungraded
Suggest 2 waste prevention strategies in design stage to promote construction sustainability?
Evaluate responses using AI:
OFF
6.
MULTIPLE SELECT QUESTION
5 mins • 1 pt
Which of the following issues can be minimized through the implementation of green building?
You may choose more than one if applicable.
Energy use
CO2 emission
Water use
Solid waste
7.
FILL IN THE BLANK QUESTION
5 mins • 1 pt
_________________ is the capability of a design to be constructed. It is one of a project management technique for reviewing construction processes from start to finish during the design and pre-construction phase to identify potential obstacles before a project is actually built to reduce or prevent error, delays, cost overruns, wastages etc.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?