Search Header Logo

Multiplying and Dividing Rational Numbers Word Problems

Other

7th Grade

CCSS covered

Used 24+ times

Multiplying and Dividing Rational Numbers Word Problems
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

17 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Melanie is training for a track meet. She ran 11  and 1/4 miles total, 5 days this week. How far did Melanie run each day? (First, write the problem. Then, solve). 

2  1/4 miles
56  1/4 miles
3 miles
4 miles

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Alexandra made a rectangular quilt that measured 3 and 1⁄4 feet in length by 2 and 3⁄4 feet in width. What is the area?
Reminder: to find the area, multiply the length and width. 

8 and 15⁄16 square feet
8 and 5⁄6 square feet
8 and 10⁄12 square feet

Tags

CCSS.5.NF.B.4B

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

If there were 12 people at a pizza party and each person ate 1/4 of a pizza, then how many pizzas were eaten?

48

3

2

8

Tags

CCSS.5.NF.B.7B

CCSS.5.NF.B.7C

4.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

The temperature is dropping at a rate of 2½ degrees for 4¼ hours. How much did the temperature drop?

-8 and 1/8

-10 and 5/8

-1 and 7/10

-1 and 3/4

Tags

CCSS.7.NS.A.2A

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Valerie bought a 9 ft piece of ribbon from which she wants to cut into 2/3 ft pieces. How many 2/3 ft pieces can Valerie cut?

13.5

6

9

This is not possible.

6.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

A grocery store sells chicken for $3.30 per pound. What would be the cost of 2 1/2 pounds of chicken?

$8.00

$8.25

$82.50

$0.80

Tags

CCSS.6.NS.B.3

7.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

A team of workers took 225.5 hours to complete a task. A smaller team of workers will complete the same task, but it will take them 1.5 times as long as it took the first team. How long will it take the smaller team to complete the job?

338.25 hours

3382.50 hours

33.82 hours

400 hours

Tags

CCSS.7.EE.B.3

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?